1 November 8, 2005 Philip Wheatley NSNFP Fiscal Year 2006 Workscope

2 Repository Analysis Criticality –Criticality support to license application –Configuration Generator Model –EQ3/6 –Fissile loading Design Envelope –Total System Performance Assessment SNF and HLW –Preclosure safety analysis –Update of canister survivability report Technical Support –Licensing application analysis –Yucca Mountain onsite representative –Spent Fuel Database

3 Standardized Canister Development Internals Materials Dynamic strain rate testing –Elevated temperature –Non-welded –Welded

4 Welding and NDE Development –Design review –Eddy current testing development Code case –Ultrasonic testing development

5 MCO Transportability Criticality Shielding Heat transfer Top head fix

6 Transportation Support Transportation integration Transportation and RW/EM planning Transportation procurement

7 Advanced Neutron Absorber Development ASME Code Case Scale-up Microstructure characterization Mechanical process development Forming and welding Neutronic qualification

8 Integration Activities HQ SNF/HLW integration meetings Integrated acceptance schedule SRS/Idaho fuel transfers SNF/HLW heat generation rates

9 Quality Assurance Maintain RW acceptance of the NSNFP Ensure that quality related technical activities and products meet NSNFP QA program requirements Perform audits and surveillances