Download presentation
Presentation is loading. Please wait.
Published byHerbert Wiggins Modified over 9 years ago
1
Energistics PRODML Workgroup 07 Daily Volume Reporting Pilot Project
2
ConocoPhillips Don Van Speybroeck, Pilot Lead Jose Rivas, Reporting Lead Thomas Vanya, Test Environment Lead AspenTech Chris Hewitt, Technical Lead Norbert Meierhoefer, Functional Lead Kongsberg Per Arild Andresen, PhD, Technical Lead P2 Energy Solutions Kiran Vajrala, Technical Lead Dave Johnson, Functional Lead Iain Saunderson, Test Environment Lead ConocoPhillips Daily Volume Reporting PRODML Pilot Team
3
ConocoPhillips Daily Volume Reporting PRODML Pilot Problem Statement Rebuilding and remapping software application interfaces to produce daily production reports should not be so complicated. Software applications and database systems in the Upstream Production environment have different data requirements for collection, analysis, and reporting functions. The systems data flow and analysis requirements change in size and functionality as the assets grow and evolve. Continuous data mapping and custom interface development efforts between applications and systems can be eliminated through the adoption of industry standard network and volume models defined in PRODML.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.