Download presentation
Presentation is loading. Please wait.
Published byBarrie Cross Modified over 9 years ago
2
KIDS FIT FOR LIFE Prepared by: Michael HelselProject Manager Lloyd WestBusiness Analyst Roger MillerHardware Engineer Daryl BasarabGraphic Designer
3
INITIAL ANALYSIS Project description Project description Project requirements Project requirements Budget Budget Schedule Schedule
4
Final Status Report Project Name: Kids Fit For Life Team Member Name: Roger Miller Date: 05/07/2008 Reporting Period: 04/03/2008 – 05/07/2008 Work completed this reporting period: -Initial use case diagram and narratives -ERD and Class Diagram -Flow chart and Story Board -RFQ’s -Analysis specifications delivered and given tentative approval. Work to complete next reporting period: -Purchase hardware -Hardware setup -Create web site -Roll out product What’s going well and why: - The Team continues to work well together due to weekly meetings where problems and conflicts are addressed and resolved. - Tentative approvals have been given by the Client on project analysis; this has been accomplished due to the diligence and cooperation of all team members. What’s not going well and why: - Content development. The content is taking longer to develop as a result of client changes and modifications. Suggestions/Issues: Project changes - Content scope now requires an end user survey to start after the user exits the program.
5
LESSONS LEARNED TEAMWORK TEAMWORK TIME MANAGEMENT TIME MANAGEMENT COMMUNICATION COMMUNICATION PROJECT SPONSOR PROJECT SPONSOR
6
SOFTWARE DEVELOPMENT USE CASES USE CASES ERD ERD CLASS DIAGRAM CLASS DIAGRAM
7
USE CASE
8
NARRATIVE
9
ERD
10
CLASS DIAGRAM Get Health Information
11
SELECT LANGUAGE
12
SELECT CONTENT PAGE
13
EXERCISE PAGE
14
HARDWARE DEVELOPMENT Initial requirements - Kiosk - Small Form PC ( wireless capable) - Touch-screen monitor - Speakers - Phone - Power protection - Accessories (cables, velcro, etc.)
15
Hardware Selection process Selection process –Preferred vendors –Research alternative vendors –Issue RFQ’s
16
Hardware Comparison Matrix Comparison Matrix Dell Optiplex 755 HP DC 5750 Criteria Case Size Small Form Hard drive size 80 GB Memory 1 GB PC5300 1 GB DDR Processor Speed Intel Duo Core2.2 GHz AMD Athion Dual Core 2.3 GHz Service Contract 3 Yr NBD on site Price $ 1056 $ 1196 Build Time 7 days Notes: St. Andrews prefers to use Dell products. As the matrix shows similar products are available for close to the same price. Since HP is priced higher we chose to go with Dell. Using Dell products also simplifies St. Andrews Hardware support by keeping it uniform and consistent.
17
RFQ
18
FLOW CHART CONTENT DEVELOPMENT
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.