Download presentation
Presentation is loading. Please wait.
Published byCharles Stevens Modified over 9 years ago
1
ADMINISTRATION TAYLOR OWENS JACOB BRANDON KARLY RHODES Athletic Training Lab
2
Zero Based Budget Materials that we ordered for the teaching lab. Expendable and Non-Expendable Construction that we did for the lab.
3
Expendable Non-Expendable Tape Wraps Bandages Diagnostic tools Rehabilitation equipment Whirlpools Computers Ice Machine E-stim units Athletic Training Lab
4
Rehabilitation Equipment T101 Treadmill Mini Trampoline Thera band Wall station Weight cuff wrack Sports Art Recumbent Bike
5
Modalities Game Ready Biocryo Compression units Sonicator Plus 940 Combo unit ME 994 Intelect Combo legend XT TENS units
6
Modalities Whirlpools E-22 Mini fridge Scotsman nugget ice machine Thermalater
7
Education Dell Opti Plex 780 22’’ monitor Dell 2135 CN multi function color Laser Printer. Dell 5300 wi “wireless interactive” White board
8
Construction Furr Out the Front wall Relocating of the stage cabinets. Plumbing and Electrical Tiling wet area Removing front desk Total estimated cost $13,800
9
Expendable Non-Expendable Total estimated cost $17,279.14 Total Estimated Cost $89,552.63 Athletic Training Lab
10
Total Cost: $106,831.77 Key: ll=windows(2.5’x7’) Tx=Treatment Tables(2’x6’) IM=Ice Machine(30”x28”) R=Refrigerator=(33.5”x18.5”x21.5” WP=Whirl Pool x2 (28”x15”x18”) BS=Bookshelf (12’x18) B=Bike TM= Treadmill (20”x55”) P=Podium (2’x18”) S=Sink(2’x3’)
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.