Since Pages 142 to 151 of the text are rather difficult to read, the following is a presentation of…
2
An Alternate to Pages 142-151 of “Supply Chain Logistics Management” by Bowersox, Closs, Cooper “Statistical Methods of Calculating Safety Stock Requirements and Average Inventory”
3
“Statistical Methods of Calculating Safety Stock Requirements” Assumptions: –Daily demand is different day by day. –When the supply is replenished the number of days it takes for the replenishment to arrive varies. –Therefore, we have variable demand and a variable replenishment cycle.
4
Demand Varies Each day we ship out a different amount Day 1 Warehouse
5
Demand Varies Each day we ship out a different amount Day 2 Warehouse
6
Demand Varies Each day we ship out a different amount Day 3 Warehouse
7
Replenishment Varies Supplier Every time we order a replenishment of stock, delivery time is different. Warehouse 3 Day Delivery
8
Replenishment Varies Supplier Every time we order a replenishment of stock, delivery time is different. Warehouse 5 Day Delivery
9
Replenishment Varies Supplier Every time we order a replenishment of stock, delivery time is different. Warehouse 6 Day Delivery
10
“Statistical Methods of Calculating Safety Stock Requirements” Assumptions: –Daily demand is different day by day. –When the supply is replenished the number of days it takes for the replenishment to arrive varies. –Therefore, we have variable demand and a variable replenishment cycle.
11
How Much Safety Stock Do We Need?
12
Safety stock = Safety stock required when there is variability in both demand and lead time. Mean of replenishment rate ( Standard deviation of daily sales ) plus Mean of daily sales squared ( 2 Standard deviation of replenishment rate ) 2
13
The next slide shows a table listing 25 days of sales for a hypothetical company.
14
DaySales in Cases DaySales in Cases DaySales in Cases 11001011019110 2801113020120 370121202170 4601310022100 580148023130 690159024110 712016902590 811017100 9 18140 From Strategic Logistics Management by Stock and Lambert
15
We can see there is variability in sales from day to day.
16
Demand Varies Each day we ship out a different amount Warehouse
17
Now here’s a table with a hypothetical list of the required delivery times for our company’s last 16 orders.
18
Order NumberDays required to receive order Order NumberDays required to receive order
19
Order NumberDays required to receive order Order NumberDays required to receive order 17
20
Order NumberDays required to receive order Order NumberDays required to receive order 17 210
21
Order NumberDays required to receive order Order NumberDays required to receive order 1798 210 9 3 119 4131210 5121310 6111411 781511 891612
22
We can see there is variability in the time it takes to replenish our stock.
23
We can see there is variability in the time it takes to replenish our stock Supplier Every time we order a replenishment of stock, delivery time is different. Warehouse Different Delivery Times
24
How Much Safety Stock Do We Need?
25
Safety stock = Safety stock required when there is variability in both demand and lead time. Mean of replenishment rate ( Standard deviation of daily sales ) plus Mean of daily sales squared ( 2 Standard deviation of replenishment rate ) 2
26
Safety stock = Safety stock required when there is variability in both demand and lead time. Mean of replenishment rate ( Standard deviation of daily sales ) plus Mean of daily sales squared ( 2 Standard deviation of replenishment rate ) 2 We have seen our daily sales
27
DaySales in Cases DaySales in Cases DaySales in Cases 11001011019110 2801113020120 370121202170 4601310022100 580148023130 690159024110 712016902590 811017100 9 18140 From Strategic Logistics Management by Stock and Lambert
28
Safety stock = Safety stock required when there is variability in both demand and lead time. Mean of replenishment rate ( Standard deviation of daily sales ) plus Mean of daily sales squared ( 2 Standard deviation of replenishment rate ) 2 We have seen our daily sales We will need to know the mean of daily sales and the standard deviation of daily sales
29
Safety stock = Safety stock required when there is variability in both demand and lead time. Mean of replenishment rate ( Standard deviation of daily sales ) plus Mean of daily sales squared ( 2 Standard deviation of replenishment rate ) 2 First, determine the mean of daily sales
30
DaySales in Cases DaySales in Cases DaySales in Cases 11001011019110 2801113020120 370121202170 4601310022100 580148023130 690159024110 712016902590 811017100 9 18140 From Strategic Logistics Management by Stock and Lambert Mean = 100
31
Safety stock = Safety stock required when there is variability in both demand and lead time. Mean of replenishment rate ( Standard deviation of daily sales ) plus Mean of daily sales squared ( 2 Standard deviation of replenishment rate ) 2 Let’s put our daily sales mean of 100 into our formula to determine safety stock. It’s 100 squared or 10,000
32
Safety stock = Safety stock required when there is variability in both demand and lead time. Mean of replenishment rate ( Standard deviation of daily sales ) plus ( 2 Standard deviation of replenishment rate ) 2 Let’s put our daily sales mean of 100 into our formula to determine safety stock. It’s 100 squared or 10,000 10,000
33
Safety stock = Safety stock required when there is variability in both demand and lead time. Mean of replenishment rate ( Standard deviation of daily sales ) plus ( 2 Standard deviation of replenishment rate ) 2 We have seen our replenishment rates We will need to know the mean of the replenishment rate and the standard deviation of the replenishment rate. 10,000
34
Order NumberDays required to receive order Order NumberDays required to receive order 1798 210 9 3 119 4131210 5121310 6111411 781511 891612
35
Order NumberDays required to receive order Order NumberDays required to receive order 1798 210 9 3 119 4131210 5121310 6111411 781511 891612 First the mean of the replenishment rate
36
Order NumberDays required to receive order Order NumberDays required to receive order 1798 210 9 3 119 4131210 5121310 6111411 781511 891612 First the mean of the replenishment rate Mean = 10
37
Safety stock = Safety stock required when there is variability in both demand and lead time. Mean of replenishment rate ( Standard deviation of daily sales ) plus ( 2 Standard deviation of replenishment rate ) 2 Let’s put our replenishment rate mean of 10 into our formula to determine safety stock. 10,000
38
Safety stock = Safety stock required when there is variability in both demand and lead time. 10 ( Standard deviation of daily sales ) plus ( 2 Standard deviation of replenishment rate ) 2 Let’s put our replenishment rate mean of 10 into our formula to determine safety stock. 10,000
39
Safety stock = Safety stock required when there is variability in both demand and lead time. 10 ( Standard deviation of daily sales ) plus ( 2 Standard deviation of replenishment rate ) 2 Now we need the standard deviation of daily sales and the standard deviation of the replenishment rate. 10,000
40
(Observation – mean) 2 N-1 Find the Standard Deviation of Daily Sales Q S =
41
(Observation – mean) 2 N-1 Now Find the Standard Deviation of the Sales Q S = Remember, the mean or average is 100
42
(Observation – 100) 2 N-1 Now Find the Standard Deviation of the Sales Q S = Remember, the mean or average is 100
43
(Observation – 100) 2 N-1 Now Find the Standard Deviation of the Sales Q S = Now calculate how far each day’s sales are from the mean. Remember, the mean or average is 100
44
DaySales in Cases Deviation from mean Deviation Squared 1100 280 370 460 580 690 7120 8110 9100 Mean = 100 From Strategic Logistics Management by Stock and Lambert
45
DaySales in Cases Deviation from mean Deviation Squared 1100 280 370 460 580 690 7120 8110 9100 Mean = 100 From Strategic Logistics Management by Stock and Lambert minus mean of 100 =
46
DaySales in Cases Deviation from mean Deviation Squared 11000 280 370 460 580 690 7120 8110 9100 Mean = 100 From Strategic Logistics Management by Stock and Lambert
47
DaySales in Cases Deviation from mean Deviation Squared 110000 X 0 = 280 370 460 580 690 7120 8110 9100 Mean = 100 From Strategic Logistics Management by Stock and Lambert
48
DaySales in Cases Deviation from mean Deviation Squared 110000 280 370 460 580 690 7120 8110 9100 Mean = 100 From Strategic Logistics Management by Stock and Lambert
49
DaySales in Cases Deviation from mean Deviation Squared 110000 280 370 460 580 690 7120 8110 9100 Mean = 100 From Strategic Logistics Management by Stock and Lambert minus mean of 100 =
50
DaySales in Cases Deviation from mean Deviation Squared 110000 280-20 370 460 580 690 7120 8110 9100 Mean = 100 From Strategic Logistics Management by Stock and Lambert
51
DaySales in Cases Deviation from mean Deviation Squared 110000 280-20-20 x -20 = 370 460 580 690 7120 8110 9100 Mean = 100 From Strategic Logistics Management by Stock and Lambert
52
DaySales in Cases Deviation from mean Deviation Squared 110000 280-20400 370 460 580 690 7120 8110 9100 Mean = 100 From Strategic Logistics Management by Stock and Lambert
53
DaySales in Cases Deviation from mean Deviation Squared 110000 280-20400 370 460 580 690 7120 8110 9100 Mean = 100 From Strategic Logistics Management by Stock and Lambert minus mean of 100 =
54
DaySales in Cases Deviation from mean Deviation Squared 110000 280-20400 370-30 460 580 690 7120 8110 9100 Mean = 100 From Strategic Logistics Management by Stock and Lambert
55
DaySales in Cases Deviation from mean Deviation Squared 110000 280-20400 370-30-30 x -30 = 460 580 690 7120 8110 9100 Mean = 100 From Strategic Logistics Management by Stock and Lambert
56
DaySales in Cases Deviation from mean Deviation Squared 110000 280-20400 370-30900 460 580 690 7120 8110 9100 Mean = 100 From Strategic Logistics Management by Stock and Lambert
57
DaySales in Cases Deviation from mean Deviation Squared 110000 280-20400 370-30900 460 580 690 7120 8110 9100 Mean = 100 From Strategic Logistics Management by Stock and Lambert minus mean of 100 =
58
DaySales in Cases Deviation from mean Deviation Squared 110000 280-20400 370-30900 460-40 580 690 7120 8110 9100 Mean = 100 From Strategic Logistics Management by Stock and Lambert
59
DaySales in Cases Deviation from mean Deviation Squared 110000 280-20400 370-30900 460-401600 580 690 7120 8110 9100 Mean = 100 From Strategic Logistics Management by Stock and Lambert
60
DaySales in Cases Deviation from mean Deviation Squared 110000 280-20400 370-30900 460-401600 580-20400 690-10100 7120+20400 8110+10100 9 00 Mean = 100 From Strategic Logistics Management by Stock and Lambert
61
DaySales in Cases Deviation from mean Deviation Squared 10110+10100 11130+30900 12120+20400 1310000 1480-20400 1590-10100 1690-10100 1710000 18140+401600 Mean = 100 From Strategic Logistics Management by Stock and Lambert
62
DaySales in Cases Deviation from mean Deviation Squared 1911010100 2012020400 2170-30900 2210000 2313030900 2411010100 2590-10100 Mean = 100 From Strategic Logistics Management by Stock and Lambert
63
(Observation – 100) 2 N-1 Find the Standard Deviation of the Sales Q S = Now add up all the squared deviations, known as “squares” to find the “sum of squares.”
64
DaySales in Cases Deviation from mean Deviation Squared 110000 280-20400 370-30900 460-401600 580-20400 690-10100 7120+20400 8110+10100 9 00 Mean = 100 From Strategic Logistics Management by Stock and Lambert Now add up all the squares
65
DaySales in Cases Deviation from mean Deviation Squared 10110+10100 11130+30900 12120+20400 1310000 1480-20400 1590-10100 1690-10100 1710000 18140+401600 Mean = 100 From Strategic Logistics Management by Stock and Lambert Now add up all the squares
66
DaySales in Cases Deviation from mean Deviation Squared 1911010100 2012020400 2170-30900 2210000 2313030900 2411010100 2590-10100 Sum of squares = 10,000 Mean = 100 From Strategic Logistics Management by Stock and Lambert Now add up all the squares
67
10000 N-1 Now Find the Standard Deviation of the Sales Q S = Sum of squares
68
10000 N-1 Now Find the Standard Deviation of the Sales Q S = N= number of days of sales
69
10000 25-1 Now Find the Standard Deviation of the Sales Q S = N= number of days of sales
70
10000 24 Now Find the Standard Deviation of the Sales Q S =
71
Q S = 416.66666 Of which the square root is…
72
Now Find the Standard Deviation of the Sales Q S = 20.4 Rounded to 20
73
Safety stock = Safety stock required when there is variability in both demand and lead time. ( Standard deviation of daily sales ) plus ( 2 Standard deviation of replenishment rate ) 2 Let’s put that daily sales standard deviation of 20 into our formula for safety stock. 10 10,000
74
Safety stock = Safety stock required when there is variability in both demand and lead time. ( 20 ) plus ( 2 Standard deviation of replenishment rate ) 2 Let’s put that daily sales standard deviation of 20 into our formula for safety stock. 10 10,000
75
Safety stock = Safety stock required when there is variability in both demand and lead time. ( 400 ) plus ( 2 Standard deviation of replenishment rate ) 2 Let’s put that daily sales standard deviation of 20 into our formula for safety stock. And square it. 10 10,000
76
Safety stock = Safety stock required when there is variability in both demand and lead time. 400 plus ( Standard deviation of replenishment rate ) 2 Let’s put that daily sales standard deviation of 20 into our formula for safety stock. And square it. 10 10,000
77
Safety stock = Safety stock required when there is variability in both demand and lead time. 400 plus ( Standard deviation of replenishment rate ) 2 And find the standard deviation for the replenishment rate 10 10,000
78
Order Numb er Days required to receive order Deviation from mean Deviation squared 17 210 3 413 512 611 78 89 Replenishment rate mean = 10
79
Order Numb er Days required to receive order Deviation from mean Deviation squared 17 210 3 413 512 611 78 89 Replenishment rate mean = 10 minus mean of 10 =
80
Order Numb er Days required to receive order Deviation from mean Deviation squared 17-3 210 3 413 512 611 78 89 Replenishment rate mean = 10
81
Order Numb er Days required to receive order Deviation from mean Deviation squared 17-39 210 3 413 512 611 78 89 Replenishment rate mean = 10
82
Order Numb er Days required to receive order Deviation from mean Deviation squared 17-39 210 3 413 512 611 78 89 Replenishment rate mean = 10 minus mean of 10 =
83
Order Numb er Days required to receive order Deviation from mean Deviation squared 17-39 2100 3 413 512 611 78 89 Replenishment rate mean = 10
84
Order Numb er Days required to receive order Deviation from mean Deviation squared 17-39 21000 3 413 512 611 78 89 Replenishment rate mean = 10
85
Order Numb er Days required to receive order Deviation from mean Deviation squared 17-39 21000 3 413 512 611 78 89 Replenishment rate mean = 10 minus mean of 10 =
86
Order Numb er Days required to receive order Deviation from mean Deviation squared 17-39 21000 3 0 413 512 611 78 89 Replenishment rate mean = 10
87
Order Numb er Days required to receive order Deviation from mean Deviation squared 17-39 21000 3 00 413 512 611 78 89 Replenishment rate mean = 10
88
Order Numb er Days required to receive order Deviation from mean Deviation squared 17-39 21000 3 00 413 512 611 78 89 Replenishment rate mean = 10 minus mean of 10 =
89
Order Numb er Days required to receive order Deviation from mean Deviation squared 17-39 21000 3 00 413+3 512 611 78 89 Replenishment rate mean = 10
90
Order Numb er Days required to receive order Deviation from mean Deviation squared 17-39 21000 3 00 413+39 512+24 611+11 78-24 891 Replenishment rate mean = 10
91
Order Numb er Days required to receive order Deviation from mean Deviation squared 98-24 1091 1191 121000 131000 1411+11 1511+11 1612+24 Replenishment rate mean = 10
92
Order Numb er Days required to receive order Deviation from mean Deviation squared 98-24 1091 1191 121000 131000 1411+11 1511+11 1612+24 Replenishment rate mean = 10 Sum of squares = 40
93
(Observation – mean) 2 N-1 Q R = Find the Standard Deviation of the replenishment rate
94
40 N-1 Q = Sum of squares Find the Standard Deviation of the replenishment rate R
95
N-1 Q = N= number orders placed 40 Find the Standard Deviation of the replenishment rate R
96
16-1 Q = N= number orders placed 40 Find the Standard Deviation of the replenishment rate R
97
15 Q = 40 Find the Standard Deviation of the replenishment rate R
98
Q = 2.66666 Of which the square root is… Find the Standard Deviation of the replenishment rate R
99
Q = 1.634 Find the Standard Deviation of the replenishment rate R
100
Safety stock = Safety stock required when there is variability in both demand and lead time. 400 plus ( Standard deviation of replenishment rate ) 2 Let’s put that replenishment rate standard deviation of 1.634 into our formula for safety stock. 10 10,000
101
Safety stock = Safety stock required when there is variability in both demand and lead time. 400 plus ( 1.634 ) 2 Let’s put that replenishment rate standard deviation of 1.634 into our formula for safety stock. 10 10,000
102
Safety stock = Safety stock required when there is variability in both demand and lead time. 400 plus 2.669 Let’s put that replenishment rate standard deviation of 1.634 into our formula for safety stock. And square it. 10 10,000
103
Safety stock = Safety stock required when there is variability in both demand and lead time. 400 plus 2.669 And work our formula. 10 10,000
104
Safety stock = Safety stock required when there is variability in both demand and lead time. (400) + (2.669) And work our formula. (10)(10,000)
105
Safety stock = Safety stock required when there is variability in both demand and lead time. And work our formula. 30,700
106
Safety stock = Safety stock required when there is variability in both demand and lead time. 175 cases of safety stock required.
107
Let’s bring it all together.
108
Back to our daily sales.
109
DaySales in Cases DaySales in Cases DaySales in Cases 11001011019110 2801113020120 370121202170 4601310022100 580148023130 690159024110 712016902590 811017100 9 18140 From Strategic Logistics Management by Stock and Lambert
110
The lowest number of sales in a day was 60.
111
The highest number of sales in a day was 140.
112
Back to our replenishment rate
113
Order NumberDays required to receive order Order NumberDays required to receive order 1798 210 9 3 119 4131210 5121310 6111411 781511 891612
114
The fastest we received an order was 7 days.
115
The slowest we received an order was 13 days. Therefore…
116
We have daily sales variation from 60 to 140 cases. We have replenishment rate variability from 7 to 13 days. We calculated that we would need 175 cases of safety stock to provide adequate inventory for…..
117
We have daily sales variation from 60 to 140 cases. We have replenishment rate variability from 7 to 13 days. We calculated that we would need 175 cases of safety stock to provide adequate inventory for…..Well, we can’t know how adequate that is, can we?
118
Yes, we can know.
119
Yes, we can know. By looking at service levels.
120
And by remembering that in our formula for finding safety stock we were working with 1 standard deviation for our daily sales and our replenishment rate.
121
We’ve seen this before: Standard deviation represents an average of how far observations are away from the mean.
122
There are certain characteristics of standard deviation in a normal distribution… We’ve seen this before:
124
We have a mean of x
125
We have a standard deviation of y
126
If we determine 1 standard deviation above and below the mean… We have a mean of x We have a standard deviation of y
127
If we determine 1 standard deviation above and below the mean… x+y = 1 standard deviation x-y = 1 standard deviation We have a standard deviation of y We have a mean of x
128
If we determine 1 standard deviation above and below the mean… x+y = 1 standard deviation x-y = 1 standard deviation We have a standard deviation of y We have a mean of x In a normal distribution about 68% of the observations will usually be within 1 standard deviation of the mean.
129
If we determine 1 standard deviation above and below the mean… x+y = 1 standard deviation x-y = 1 standard deviation We have a standard deviation of y We have a mean of x In a normal distribution about 68% of the observations will usually be within 1 standard deviation of the mean. 68.26%
130
If we determine 1 standard deviation above and below the mean… x+y = 1 standard deviation x-y = 1 standard deviation We have a standard deviation of y We have a mean of x 68.26% 1 standard deviation of safety stock will give us an 84.13% service level.
131
If we determine 1 standard deviation above and below the mean… x+y = 1 standard deviation x-y = 1 standard deviation We have a standard deviation of y We have a mean of x 68.26% 1 standard deviation of safety stock will give us an 84.13% service level. Just figure 100%-68.26%
132
If we determine 1 standard deviation above and below the mean… x+y = 1 standard deviation x-y = 1 standard deviation We have a standard deviation of y We have a mean of x 68.26% 1 standard deviation of safety stock will give us an 84.13% service level. Just figure 100%-68.26% = 31.74%
133
If we determine 1 standard deviation above and below the mean… x+y = 1 standard deviation x-y = 1 standard deviation We have a standard deviation of y We have a mean of x 68.26% 1 standard deviation of safety stock will give us an 84.13% service level. Just figure 100%-68.26% = 31.74%, then divide 31.74% by 2
134
If we determine 1 standard deviation above and below the mean… x+y = 1 standard deviation x-y = 1 standard deviation We have a standard deviation of y We have a mean of x 68.26% 1 standard deviation of safety stock will give us an 84.13% service level. Just figure 100%-68.26% = 31.74%, then divide 31.74% by 2 = 15.87%
135
If we determine 1 standard deviation above and below the mean… x+y = 1 standard deviation x-y = 1 standard deviation We have a standard deviation of y We have a mean of x 68.26% 1 standard deviation of safety stock will give us an 84.13% service level. Just figure 100%-68.26% = 31.74%, then divide 31.74% by 2 = 15.87% Add that to 68.26%
136
If we determine 1 standard deviation above and below the mean… x+y = 1 standard deviation We have a standard deviation of y We have a mean of x 68.26% 1 standard deviation of safety stock will give us an 84.13% service level. Just figure 100%-68.26% = 31.74%, then divide 31.74% by 2 = 15.87% Add that to 68.26% 15.87% + 68.26% = 84.13%
137
That’s how we know 175 cases of safety stock for our hypothetical company will provide us with enough stock 84% of the time.
138
Safety stock = Because when we calculated this formula, we were using 1 standard deviation. Mean of replenishment rate ( Standard deviation of daily sales ) plus Mean of daily sales squared ( 2 Standard deviation of replenishment rate ) 2
139
Safety stock = If we wanted higher service levels (and 84% is not very good), we would increase the standard deviation when we calculated the formula. Mean of replenishment rate ( Standard deviation of daily sales ) plus Mean of daily sales squared ( 2 Standard deviation of replenishment rate ) 2
140
Service Levels 1 standard deviation of safety stock = 1-.6826 +.6826 =.8413 2
141
Service Levels 1 standard deviation of safety stock = 1-.6826 +.6826 =.8413 2 2 standard deviation of safety stock = 1-.9544 +.9544 =.9772 2
142
Service Levels 1 standard deviation of safety stock = 1-.6826 +.6826 =.8413 2 2 standard deviation of safety stock = 1-.9544 +.9544 =.9772 2 3 standard deviation of safety stock = 1-.9974 +.9974 =.9987 2
143
Service Levels 1 standard deviation of safety stock = 1-.6826 +.6826 =.8413 2 2 standard deviation of safety stock = 1-.9544 +.9544 =.9772 2 3 standard deviation of safety stock = 1-.9974 +.9974 =.9987 2 84% service level
144
Service Levels 1 standard deviation of safety stock = 1-.6826 +.6826 =.8413 2 2 standard deviation of safety stock = 1-.9544 +.9544 =.9772 2 3 standard deviation of safety stock = 1-.9974 +.9974 =.9987 2 84% service level Almost 98% service level.
145
Service Levels 1 standard deviation of safety stock = 1-.6826 +.6826 =.8413 2 2 standard deviation of safety stock = 1-.9544 +.9544 =.9772 2 3 standard deviation of safety stock = 1-.9974 +.9974 =.9987 2 84% service level Almost 98% service level. Almost 100% service level
146
Service Levels 1 standard deviation of safety stock = 1-.6826 +.6826 =.8413 2 2 standard deviation of safety stock = 1-.9544 +.9544 =.9772 2 3 standard deviation of safety stock = 1-.9974 +.9974 =.9987 2 84% service level Almost 98% service level. Almost 100% service level On the next page is a service level chart. It tells you the standard deviation to use to achieve a specific service level.
147
Service Level Table Service LevelNumber of standard deviations of safety stock needed. 84.1%1 90.3%1.3 94.5%1.6 97.7%2 98.9%2.3 99.5%2.6 99.9%3
148
So how do we apply this?
149
Suppose we want a 94.5% service level.
150
So how do we apply this? Suppose we want a 94.5% service level. That means that when a customer wants a product, 94.5% of the time the product will be in stock.
151
Service Level Table Service LevelNumber of standard deviations of safety stock needed. 84.1%1 90.3%1.3 94.5%1.6 97.7%2 98.9%2.3 99.5%2.6 99.9%3 We multiply the standard deviations of our formula by 1.6
152
Safety stock = Safety stock required when there is variability in both demand and lead time. Mean of replenishment rate ( Standard deviation of daily sales ) plus Mean of daily sales squared ( 2 Standard deviation of replenishment rate ) 2 times 1.6
153
In Our Original Formula… We used 1 standard deviation. Standard deviation of daily sales was 20 The standard deviation of the replenishment rate was 1.634
154
In Our New Formula… We will use the standard deviation times 1.6 Standard deviation of daily sales was 20 The standard deviation of the replenishment rate was 1.634 Therefore, we multiply 20 by 1.6 = 32. And 1.634 by 1.6 = 2.6144
155
Safety stock = Safety stock required when there is variability in both demand and lead time. Mean of replenishment rate ( Standard deviation of daily sales ) plus Mean of daily sales squared ( 2 Standard deviation of replenishment rate ) 2 1 standard deviation =20 1 standard deviation =1.634 times 1.6 = 32 times 1.6 = 2.6144 Meaning our original formula will now be changed to…
156
Safety stock = Safety stock required when there is variability in both demand and lead time. Mean of replenishment rate ( Standard deviation of daily sales ) plus Mean of daily sales squared ( 2 Standard deviation of replenishment rate ) 2 1 standard deviation =20 1 standard deviation =1.634 times 1.6 = 32 times 1.6 = 2.6144 Meaning our original formula will now be changed to…
157
Safety stock = Safety stock required when there is variability in both demand and lead time. Mean of replenishment rate () plus Mean of daily sales squared ( 2 ) 2 32 2.6144 Meaning our original formula will now be changed to…
158
Safety stock = Safety stock required when there is variability in both demand and lead time. 10 () plus 10,000 ( 2 ) 2 32 2.6144 Meaning our original formula will now be changed to…
159
Safety stock = Safety stock required when there is variability in both demand and lead time. 10 plus 10,000 = 280.333 rounded to 280 1024 6.8350XX
160
To Provide a 94.5% Service Level… We need 280 units of safety stock.
161
We’ve Just Seen How to Determine Safety Stock. But how much average inventory should we have to achieve various levels of customer service? We need to –Determine our service level. –Determine our Economic Ordering Quantity (EOQ) –Determine our average cycle stock. –Determine our safety stock level. –Add average cycle stock and safety stock.
162
To Determine Average Inventory: Determine our service level. Let’s say it’s 84.1% Determine our Economic Ordering Quantity (EOQ). Determine our average cycle stock. Determine our safety stock level. Add average cycle stock and safety stock.
163
To Determine Economic Ordering Quantity 2C o D EOQ = C i U Where EOQ = Economic ordering quantity. C o = ordering cost (dollars per order) C i = Annual inventory carry costs (% product cost or value) D= Annual demand (number of units) U = Average cost or value of one unit of inventory
164
To Determine Economic Ordering Quantity 2C o D EOQ = C i U Where EOQ = Economic ordering quantity. C o = ordering cost (dollars per order) C i = Annual inventory carry costs (% product cost or value) D= Annual demand (number of units) U = Average cost or value of one unit of inventory We will use some data from the hypothetical organization we looked at earlier.
165
DaySales in Cases DaySales in Cases DaySales in Cases 11001011019110 2801113020120 370121202170 4601310022100 580148023130 690159024110 712016902590 811017100 9 18140 From Strategic Logistics Management by Stock and Lambert Mean = 100
166
To Determine Economic Ordering Quantity 2C o D EOQ = C i U Where EOQ = Economic ordering quantity. C o = ordering cost (dollars per order) C i = Annual inventory carry costs (% product cost or value) D= Annual demand (number of units) U = Average cost or value of one unit of inventory We will use some data from the hypothetical organization we looked at earlier.
167
To Determine Economic Ordering Quantity 2C o D EOQ = C i U Where EOQ = Economic ordering quantity. C o = ordering cost (dollars per order) C i = Annual inventory carry costs (% product cost or value) D= Annual demand (number of units) U = Average cost or value of one unit of inventory Our hypothetical company had mean daily sales of 100. We multiply That by 250 business days which gives annual demand of 25,000
168
To Determine Economic Ordering Quantity 2C o (25,000) EOQ = C i U Where EOQ = Economic ordering quantity. C o = ordering cost (dollars per order) C i = Annual inventory carry costs (% product cost or value) D= Annual demand (number of units) U = Average cost or value of one unit of inventory Our hypothetical company had mean daily sales of 100. We multiply That by 250 business days which gives annual demand of 25,000
169
To Determine Economic Ordering Quantity 2C o (25,000) EOQ = C i U Where EOQ = Economic ordering quantity. C o = ordering cost (dollars per order) C i = Annual inventory carry costs (% product cost or value) D= 25,000 U = Average cost or value of one unit of inventory Our other values will be arbitrary for the sake of this exercise.
170
To Determine Economic Ordering Quantity 2(28)x (25,000) EOQ = C i U Where EOQ = Economic ordering quantity. C o = $28 C i = Annual inventory carry costs (% product cost or value) D= 25,000 U = Average cost or value of one unit of inventory Our other values will be arbitrary for the sake of this exercise.
171
To Determine Economic Ordering Quantity 2(28)x (25,000) EOQ =.32 x U Where EOQ = Economic ordering quantity. C o = $28 C i = 32% D= 25,000 U = Average cost or value of one unit of inventory Our other values will be arbitrary for the sake of this exercise.
172
To Determine Economic Ordering Quantity 2(28)x (25,000) EOQ =.32 x 4.37 Where EOQ = Economic ordering quantity. C o = $28 C i = 32% D= 25,000 U = $4.37 per case Our other values will be arbitrary for the sake of this exercise.
173
To Determine Economic Ordering Quantity EOQ = 1,000 Where EOQ = Economic ordering quantity. C o = $28 C i = 32% D= 25,000 U = $4.37 per case
174
To Determine Average Inventory Determine our service level. Let’s say it’s 84.1% Determine our Economic Ordering Quantity (EOQ). Determine our average cycle stock. Determine our safety stock level. Add average cycle stock and safety stock.
175
To Determine Average Cycle Stock… As we saw earlier, it is one half of order quantity
176
The Effect of Reorder Quantity on Average Inventory Investment with Constant Demand and Lead Time a 6-3 a Cycle stock is one-half the ordering quantity. From instructor’s material: “Strategic Logistics Management” by Stock and Lambert(2001).
177
Cycle Stock = ½ Ordering Quantity EOQ = 1,000 Where EOQ = Economic ordering quantity. C o = $28 C i = 32% D= 25,000 U = $4.37 per case 2 = 500
178
To Determine Average Inventory Determine our service level. Let’s say it’s 84.1% Determine our Economic Ordering Quantity (EOQ). Determine our average cycle stock. Determine our safety stock level. Add average cycle stock and safety stock.
179
Safety stock = Safety stock required when there is variability in both demand and lead time. Mean of replenishment rate ( Standard deviation of daily sales ) plus Mean of daily sales squared ( 2 Standard deviation of replenishment rate ) 2 Using our data from our hypothetical organization, we have already seen that for an 84.1% service level, we need 175 cases of safety stock.
180
To Determine Average Inventory Determine our service level. Let’s say it’s 84.1% Determine our Economic Ordering Quantity (EOQ). Determine our average cycle stock. Determine our safety stock level. Add average cycle stock and safety stock.
181
To Determine Average Inventory Average cycle stock plus safety stock for this service level (84.1%) 500 cases Average cycle stock + 175 Safety stock = 675 cases Average inventory
182
To Determine Average Inventory Determine our service level. Let’s say it’s 84.1% Determine our Economic Ordering Quantity (EOQ). Determine our average cycle stock. Determine our safety stock level. Add average cycle stock and safety stock.
183
End of Program.