Download presentation
Presentation is loading. Please wait.
Published byAlban Fletcher Modified over 9 years ago
1
SPSS Tree Chaid Demo
2
Variable and Values 1. Analyse value categories and redefine variables as appropriate (Scale, Ordinal, Nominal) 2. Frequency on dependent variable to determine (n and % of responses) 3. Calculate BE point (FC/GM)
3
Oversample If responses unbalance, create a weight variable R1/R2 = Multiplier Recode response into a new weight variable such as R1 = 1 and R2 = Multiplier. Run Tree using weight variable as an influence variable
4
DMDATA IDNominalNot Used RespondedNominalUsed PreviousNominalNot Used ControlPackageNominalNot Used PostalCodeNominalNot Used AgeScaleUsed IncomeOrdinalUsed EducationNominalUsed ResideScaleUsed GenderNominalUsed MarriedNominalUsed ChildrenOrdinalUsed RegionNominalUsed SequenceNominalNot Used
5
Responses Create weight: 1820/97 = 19 Recode into a different variable: Responded Weight Old (0) New (1) Old (1) New (19)
6
Economics Fixed cost = $0.80 Gross Revenue = $20.00 BE .8/20 =.04
7
SPSS Tree
8
Output and Criteria Manage Nodes to end up with a maximum of 10 nodes
9
Missing values and Profits
11
Gains
12
Classification Matrix
13
Lab Exercise File: Subscribe.sav Cost: $2.40 Gross income: $30 Dependant variables: response2
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.