Using PI to Monitor Hydroelectric Control Systems Presented by Jeff Mettler Chelan County PUD Wenatchee, WA 98801
2
Our First Week with PI Bad SCADA Transducers Found
3
System Operations System One Line Display PNSC Report Water System Alarm Summary Water System Station Level Monitoring Water System Equipment Monitoring
4
System Operators: One-Line Diagram
5
System Operators: PNSC Report
6
System Operators: Water System Alarm Summary
7
System Operators: Reservoir 1
8
System Operators: Hawley St. Pump Station
9
Network Manager: Overview Page
10
Network Manager: Ping Response
11
Network Manager: TCP Ping Response
12
Network Manager: Device Uptimes (SNMP)
13
Network Manager: Network Utilization (SNMP)
14
Network Manager: SNMP Device Analysis
15
Network Manager: Packet Sniffing (Netflow)
16
Network Manager: PI Server IO Rates
17
Network Manager: PI Server Performance
18
Hydro Operators Cruise Control Monitoring Mid Columbia River Flows Operator Created Displays Transformer Temperature Monitoring Bearing Temperature Monitoring Unit Vibration Monitoring
19
Cruise Control Monitoring
20
Hydro Operators: River Flows
21
Hydro Operators: They’ve been busy!
22
Hydro Operators: Transformer Temperatures
23
Hydro Operators: Bearing Temperatures
24
Hydro Operators: Vibration Montoring
25
Plant Engineers Plant Deviation Analysis Temperature Analysis Unit Trip and Failed Starts Analysis
26
Plant Engineers : Plant Deviation
27
Plant Engineers : Temperature Analysis
28
Plant Engineers : Unit Trip/Failed Start Analysis (1)
29
Plant Engineers : Unit Trip/Failed Start Analysis (2)
30
Generation Managers River Flow Analysis Plant Generation Analysis Unit Start/Stop Analysis Plant Optimization Analysis
31
Generation Managers: River Flow Analysis
32
Generation Managers: Plant Generation Analysis
33
Generation Managers: Unit Start/Stop Analysis
34
Generation Managers: Plant Optimization Analysis (1)
35
Generation Managers: Plant Optimization Analysis (2)
36
Summary Many users throughout the organization use PI for differing reasons Trending is heavily used by the operators Data Gathering/Analysis is used by the engineers and managers The ease of Trending and Data gathering has taken much of the burden off of the Control Systems Analysts