W.Van Doninck Re-scope TDR August 2008 The forward RPC system (TDR) China Korea Pakistan Gap production Korea Gap production Korea Front-end electronics.

Similar presentations


Presentation on theme: "W.Van Doninck Re-scope TDR August 2008 The forward RPC system (TDR) China Korea Pakistan Gap production Korea Gap production Korea Front-end electronics."— Presentation transcript:

1 W.Van Doninck Re-scope TDR August 2008 The forward RPC system (TDR) China Korea Pakistan Gap production Korea Gap production Korea Front-end electronics Pakistan Front-end electronics Pakistan “ Thin design everywhere ” 2

2 W.Van Doninck Re-scope TDR August 2008 Existing at present China Pakistan Staged Low eta chambers identical for stations 2,3 and 4

3 W.Van Doninck Re-scope TDR August 2008 Restoring the TDR system ?  Build station RE4 i.e.144 RPC of the low  type  Services to the RE4 station  High  RPC’s: 72 RE1/1 + 36 RE2/1 + 36 RE3/1 (high rate!)  Services to high  RPC’s (gas & cooling foreseen)  Restore HV to 1 channel/chamber (NOT 2 ch/ch)  Little design and integration required  Requires YE4 shielding walls to support RE4 Price tag (without link and trigger system) ~ 4.3 Mio CHF

4 W.Van Doninck Re-scope TDR August 2008 Improvement from extra plane Results shown for range of RPC efficiency & noise

5 W.Van Doninck Re-scope TDR August 2008 A possible road to a 5 station system  Support RE4 From YE3  Move the present RE2 station to YE4 to become RE4  Rebuild a new DOUBLE station RE2 ( Call it newRE2) i.e. 144 “packages” for the low  part.  Limit the services to present station RE2 (LBB,gas,etc…) Hence make AND/OR on the chamber package. May need extra HV, LV.  NO increase of the trigger system wrt TDR  Live in EXISTING envelope (no shimming of magnet).  Design work and integration required ! ÞRest of this talk (also see Luc’s talk)  High  part as before (with RE2/1 double RPC) Price tag (without link and trigger system) ~ 6.0 Mio CHF

6 W.Van Doninck Re-scope TDR August 2008 New RE2: double RPC with on chamber AND/OR logic See Luc’s talk

7 W.Van Doninck Re-scope TDR August 2008 Possible (aggressive) timeline for phase I Mumbai RPC conference

8 W.Van Doninck Re-scope TDR August 2008 Status of discussions  Korean Gas gap production facility to remain active and funded  Mechanical parts from China (funded)  Continuing help from barrel RPC’s (FEB, Coincidence etc…)  Keep the ISR lab facilities active (continued support from CERN )  Enough funding available ? Upgrade is estimated at ~ 6 Mio CHF (cfr. RRB document) Confirmed partnership: Belgium-China-India-Korea-Pakistan Under discussion: CERN-Italy-Iran-Egypt  Define the responsibilities among the partners The FW RPC upgrade is mandatory for physics at the design luminosity of LHC and even more so for SLHC The presently build initial system of 3 stations at low  requires to be more than doubled !

9 W.Van Doninck Re-scope TDR August 2008 RE4 on YE3

10 W.Van Doninck Re-scope TDR August 2008 InterfaceInterface

11 RE4 near yoke

12 W.Van Doninck Re-scope TDR August 2008 RE4 near yoke

13 W.Van Doninck Re-scope TDR August 2008 And off yoke RE4

14 W.Van Doninck Re-scope TDR August 2008 Envelope 626+20=646mm of 655 available 626 mm

15 W.Van Doninck Re-scope TDR August 2008 Summary and conclusions  RE up-scope required by Physics at the LHC design Luminosity  We can do better than the TDR version at little extra cost  Collaboration ~ defined and funding (at least for Phase I) secured  Mechanics and gas gaps defined and installation scenario understood  Details on services still to be finalized We seek approval for Phase I to start orders of HPL and mechanics


Download ppt "W.Van Doninck Re-scope TDR August 2008 The forward RPC system (TDR) China Korea Pakistan Gap production Korea Gap production Korea Front-end electronics."