Presentation is loading. Please wait.

Presentation is loading. Please wait.

Project Scheduling Software

Similar presentations


Presentation on theme: "Project Scheduling Software"— Presentation transcript:

1 Project Scheduling Software
Project Management MOT 8221 Karl Smith Project Scheduling Models Critical Path Method (CPM) Program Evaluation and Review Technique (PERT) Project Scheduling Software CritPath Primavera Microsoft Project

2 Critical Path Method (CPM)
Deterministic B 1 estimate of activity duration Estimating Activity Duration 1. Activity length between 0.5% and 2% of project duration. If a project takes a year, each activity should be between a day and a week. 2. Critical activities that fall below this range should be included. 3. If the number of activities is very large (say, above 250), the project should be divided into subprojects, and individual schedules developed for each.

3

4 Primavera – P3 Gantt Chart

5 Primavera – P3 Activity on Node (AON) Precedence Network

6 Program Evaluation and Review Technique (PERT)
Stochastic B 3 estimates of activity duration Estimates of Activity Duration (SBG, p. 309) a = optimistic time m = most likely time b = pessimistic time expected duration = (a + 4m + b)/6 s2 = ((b - a)/6))2

7 7

8 8

9 9

10 10

11 11

12 12


Download ppt "Project Scheduling Software"

Similar presentations


Ads by Google