CosmicSatCosmicSat University of Northern Colorado April 2, 2004
2
CosmicSat Goals Objective: Determine charged particle count with altitude using a coincidence count detector NASA Benefits: Measure cosmic radiation in a Mars-like atmosphere using a small detector
3
CosmicSat System Requirements: Detectors, coincidence counts circuit, housing, heating circuit and data storage. Payload mass - ~ 2 kg Atmospheric temperatures of ~ - 60 degrees F Large atmospheric pressure differential Coronal Discharge Magnetic shielding Crash survival
4
CosmicSat: System Overview Scintillator PMT Scintillator Coincidence Circuit Data Logger Batteries Heater Circuit Switches
5
Subsystem: PMTs and Scintillator Purpose: Scintillator: Interacts with charged particles Excites electrons between molecular bound states Electrons emit photons Photon travels along scintillator undergoing many total internal reflections Photomultiplier Tubes: Collect photons Converts photons to an electronic signal
6
PMTs and Scintillator Photomultiplier Tube Module Interfaces: Base encased with PMT High voltage source in base Requires an external 5V power source Base interfaced with coincidence count circuit Optical grease between PMT face and scintillator Base PMT Head
7
PMTs and Scintillator The PMTs bonded to scintillator The PMTs bonded to scintillator Organic Scintillator wrapped in Mylar foil and electrical tape Organic Scintillator wrapped in Mylar foil and electrical tape PMTs wired to coincidence circuit via BNCs PMTs wired to coincidence circuit via BNCs Scintillator PMT Scintillator Charged Particles Optical Grease Vacuum Epoxy
8
PMTs and Scintillator Housing: Housing: PMTs encased in PVC pipe – maintain atmospheric pressure PMTs encased in PVC pipe – maintain atmospheric pressure PMT – scintillator joined with vacuum epoxy and then JB Weld. PMT – scintillator joined with vacuum epoxy and then JB Weld. PVC capped and interfaced with BNCs for wires PVC capped and interfaced with BNCs for wires BNCPVC JB Weld Vacuum Epoxy Scintillator
9
Housing Prototype
10
System Stabilization The two PVC pipes bonded with ABS “glue” Adds support for all system components Tether passes through brass tube in center Each PMT - Scintillator combination slides into frame. Wood Frame Brass Tube
11
The Exterior Box Materials Reflective Mylar Reflective Mylar Insulation Insulation Foam Core Foam Core ThermoSheild Paint ThermoSheild Paint Aluminum tape Aluminum tape Epoxy Epoxy
12
Coincidence Counting Circuit Purpose: Purpose: To supply each PMT with 5 V To supply each PMT with 5 V To time impulses from each PMT and determine coincidences To time impulses from each PMT and determine coincidences Send count impulses to data logger Send count impulses to data logger
13
Coincidence Timing Circuit Courtesy of Lawrence Berkeley National Laboratory
14
Circuit System Schematic Interfaces: Interfaces: Two PMT Modules Two PMT Modules Two nine volt batteries in series Two nine volt batteries in series MadgeTech Data Logger MadgeTech Data Logger Circuit
15
Circuit: Start to Finish Courtesy of Lawrence Berkeley National Laboratory
16
Data Collection Purpose : Collect electronic pulses from the circuit Put a time stamp to each pulse
17
Data Collection Schematic Computer Data Logger Circuit During FlightPost-Recovery
18
Heater Circuit Six Resistors – Six Resistors – 3.9 ohm, 3.9 ohm, 5Watt 5Watt Three 9 Volt batteries in parallel Three 9 Volt batteries in parallel Keep payload interior > Keep payload interior > 5 C 5 C Batteries in parallel Resistors
19
Mass Budget Total Mass ~1700 gms
20
Power Budget 18 Volts to the Coincidence Count Circuit and 18 Volts to the Coincidence Count Circuit and PMT modules High voltage source is housed within the PMT base PMT modules High voltage source is housed within the PMT base Power out – heater – 18 watts Power out – heater – 18 watts 9 Volts to the heater circuit (three 9 V batteries in parallel) 9 Volts to the heater circuit (three 9 V batteries in parallel) Heater Current requirments: Heater Current requirments: 1450 mA 1450 mA
21
Budget PMT Modules~ 2300.00 MadgeTech Data Logger~ 195.00 Batteries~ 100.00 Box Materials~ 100.00 LX 200~ 250.00 Geiger tube~ 270.00 Cables~ 50.00 Buffing Compound~ 125.00 Optical Grease~ 75.00 Electronic components~ 50.00 Total __________________________________________ ~3515.00
22
Project Organization Project Advisors: Project Advisors: Dr. Robert Walch Dr. Robert Walch Dr. Dick Dietz Dr. Dick Dietz Dr. Cynthia Galovich Dr. Cynthia Galovich Dr. Kendall Mallory Dr. Kendall Mallory Project Manager: Project Manager: Pat Mills Pat Mills Electronics: Julie Smith Data Collection & Heater: Ryan Marshall PMT Module & Scintillator: Anna Samsel System Housing & Stabilization: Levi Ellis
23
Schedule April 5 – 10: Individual component testing Construct the housing and frame Construct the detector Construct the Geiger tube – Palmtop detector April 11 – 16: Test the whole system Make any final adjustments April 17 : Launch
24
Acknowledgements Dr. M. A. Duvernois University of Minnisota Dr. James Connell University of New Hampshire Dr. Howard Matis Lawrence Berkeley National Laboratory Andrew Loomis UNC Ken Cochran UNC Many Thanks to: Kodak for their financial support for optics projects at UNC The Colorado Space Grant Consortium, NASA and JPL for giving us this wonderful opportunity The UNC Dept. of Physics faculty; without whom, none of this would be possible