1 -TBWG next meeting 8 - Presentation of Parties, in particular on action 17 and action 19 (TBWG-15), including: Progress of work Impact on TBMs of frame design and of TBM replacement procedure (action 17) For each TBM, preliminary detailed R&D program, including timescale and milestones, up to the installation in ITER (2015), estimations of costs, comments on QA, comments on collaboration expected with other Parties (action 19) -Tom Mann joins us - Conference call emphasis Report of Material Group trip to Europe Structural Material Strategy Engineering design and ancillary equipment Progress reports on R&D and other areas - Date for next physical meeting (Dec. 12-13 or 13-14 or 14-15?) - Reminders of general costing guidelines - Reminder of Milestones Introductory Remarks (M. Abdou) ITER-TBM Conference Call - October 27, 2005
2
2 Some General Guidelines for the US TBM Costing Cost for the Reference Case Cost is for the period between now and the shipment of the TBM deliverables (Test articles and ancillary equipment) in 2015 for DAY ONE ITER operation. The period is 10 years from 2006 to 2015 The cost is the total cost for the TBM project (based on the Reference designs/deliverables) including R&D, design, engineering, fabrication, qualification, etc., as well as the cost of interface with ITER and other parties. The deliverables are based on the Reference Designs described in the Design Summary Documents. The DCLL Reference Case has a PbLi exit temperature of 470ºC and a test module that occupies half a port. For the HCCB: submodule that has a size of 1/3 of one-half port and uses the EU (or Japan) first wall/box (first wall/box is not part of the US deliverables) The R&D Cost includes all costs related to the reference design that occur within the next 10 year period whether they are related to the first (Day ONE) Test Articles or subsequent test articles. But the Cost of the deliverables includes only the cost of the First Test Article and associated equipment. The US effort should take advantage of the R&D efforts in other parties. R&D performed by other parties and available to the US should, in general, not be duplicated by the US and should be costed separately. Cost estimates should state clearly what R&D done by the other parties is essential to the US TBM project. (agreed to August 31, 2005)
3
3 US ITER TBM Costing Activity Milestones 12-Aug-05Costing Activity Initiated 31-Aug-05WBS established for Level 6 and lower Responsible persons for Level 6 and lower assigned 7-Sep-05WBS for Level 6 and lower revised 9-Sep-05Conceptual design summaries for DCLL and HCCB issued 6-Oct-05Initial schedule and base cost estimate for WBS level 6 of DCLL and HCCB 27-Oct-05Initial schedule and base cost estimate for engineering design, procurement/fabrication, and ancillary equipment 7-Nov-05R&D decision criteria established 30-Nov-05Complete revised schedule and cost estimate for WBS level 6 and lower (include contingency factor) 12-13 Dec-05“Physical” Meeting (all information about costing will be presented and discussed) 16-Dec-05R&D priorities finalized 13-Jan-06 Initial Draft Costing Activity Report Due 15-Feb-06Complete Draft of Final Costing Activity Report 22-23 Feb-06Physical meeting (internal review of draft report) 1-Mar-06Complete incorporating comments into the Report 15-Mar-06Send Final TBM Cost Estimate Report to DOE 28-Mar-06“External” review
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.