1 Updates and Construction Issues
Plastic Pipe Updates and Construction Issues PHMSA Training and Qualifications

2 Plastic Pipe Advisory Bulletins and Rulemaking Updates

3 Rulemaking Process Timing can depend whether significant or non-significant Significant rules PHMSA – Office of the Secretary of Transportation(OST) – Office of Management and Budget(OMB) – Federal Register Non-Significant rules PHMSA - Federal Register OMB Determines what rules are Significant

4 Stages of Rulemaking Advanced Notice of Rulemaking (ANPRM)
Very preliminary discussions, usually generic, and typically throwing out concepts for certain areas of the code Notice of Proposed Rulemaking (NPRM) Usually more detail, including specific revisions to code Final Rule Comments sought through public rulemaking process and through technical/pipeline advisory committees consisting of representatives of public, industry and regulators

5 Current Rulemakings in Process
Miscellaneous Rulemaking EFV Expansion beyond Single Family Residences Standards Update Rule Plastic Piping System Rulemaking

6 Current Rulemakings in Process
Miscellaneous Rulemaking (Final Stage) requirements for qualifying plastic pipe joiners EFV Expansion beyond Single Family Residences (Final Stage) Rule will propose to require EFVs for: branched service lines serving more than one single family residence multi-family residential dwellings commercial buildings

7 Current Rulemakings in Process
Standards Update Rule (Based on proposal in NPRM) Would impact 22 of the 60+ standards currently incorporated by reference (IBR) ASTM D a would be incorporated through §192.7 for PE with the exception of Section 4.2 pertaining to rework ASTM D (for marking only) and ASTM D (except section 4.2) would continue to be IBR for non-PE plastics Would also add explicit paragraph in (materials) to say “Rework and/or regrind material is not allowed in plastic pipe used under this part.”

8 Plastic Piping System Rulemaking
In Draft Incorporation of 15+ new or updated standards Category 1 only for mechanical fittings Tracking and Traceability Increased Design Factor for PE (0.32 to 0.40) PA-11: revise current limitations (up to 250 psi and 6”)

9 Plastic Piping System Rulemaking (cont.)
PA-12: incorporate with limitations (up to 250 psi and 6”) Code revisions for risers based on best practices – both mains and services Additional revisions to code for installation of plastic pipe based on current best practices (i.e. use of proper backfill, trenchless installation best practices, etc.)

10 Advisory Bulletins ADB-07-01A ADB-2012-03 Delrin insert tap tees
Plexco service tee Celcon (polyacetal) caps. ADB 1978 to 1999 ½” CTS to 2” IPS Driscopipe 8000 High Density Polyethylene Pipe

11 Delrin insert tap tees

12 Plexco service tee Celcon (polyacetal) caps.

13

14

15 Plastic Pipe Construction Issues

16 Records

17 Damaged Pipe

18

19

20

21

22

23 Fusion Issues

24 Thermoplastic Pipe Materials
Acrylonitrilc-Butadiene-Styrene (ABS) Cellulose-Acetate-Butyrate (CAB) Poly Butylene (PB) Polyethylene (PE) Polyvinyl-Chloride (PVC) Polyamide (PA) As you can see we use these acronyms because the words are to hard to say. PHMSA TQ

25

26 Generic Procedures Don’t Cover …
Driscoplex 8000 Series Pipe Dupont Adlyl A (Medium or High Density) A procedure must be qualified under to join these materials

27

28

29 273, plastic procedures

30

31 Records

32 Records

33

34

35

36

37

38

39

40

41

42 Mains and Services

43 This line was “buried” when it was installed in January
This line was “buried” when it was installed in January. Buried under more than 24” of snow – thought they were good. Then the snow melted……………

44

45

46

47

48

49

50

51 Boring and Trenching

52 Records

53 Records

54

55

56 Static Electricity And here is an area of concern I think people don’t pay enough attention to. It is a real problem and if you don’t have the proper grounding equipment and training to use them, the consequences can be horrible. PHMSA TQ

57 Odorant Softens Poly and keep in mind that odorant in it’s pure liquid state can and will soften PE pipe. PHMSA TQ

58 Other Issues

59

60

61 Records

62 Be Careful and Be Safe If it doesn’t look right – It probably isn’t….

63 Bryan Kichler Bryan.Kichler@dot.gov
Thank you! Questions? Bryan Kichler