Download presentation
Presentation is loading. Please wait.
Published byGwen Neal Modified over 9 years ago
1
1/19
2
2/19 WP6 Conclusions
3
3/19 WP6 relation with other WPs WP6 based on populated with delivered through using addressing needs of Scenarios Tools Specifications WP2: Use Cases WP5: Knowledge Resources WP3: Communication and Collaboration Services WP4: TenCompetence Pilots using for connection with
4
4/19 WP6 Internal Structure designed with played in use T1: Units of Learning T2: Authoring ToolsT2: Runtime Engines T3: Assessment Model T4: Services Connection Protocol T5: Usability Test validated through validated through T6: UoL Quality Rating assessed through use connected with
5
5/19 WP6 18M Open Issues Units of Learning (Scenarios) –Bridge with WP4 TenCompetence Pilots UPF –Bridge with WP5 Knowledge Resources Giunti Connection Protocol –Bridge with WP3 Services WHO + HOW? –Bridge with WP5 Tools Giunti
6
6/19 WP6 Action Plan until Jan. Meeting Each partner approve: –distribution of effort across WP6 tasks Each partner prepare: –description of 18m work for each task –a short presentation on WP6 involvement OUNL: –Prepare a briefing document on the Assessment Model (open problems and/or problems occurred) UPF (as WP4 Leaders): –Prepare a briefing document for discussion on the Units of Learning (Scenarios) requirements for the TenCompetence pilots CERTH: –Prepare an analytic task plan and timetable for 1 st Year WP6 activities with issues to be investigated, analyzed and solved
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.