09/02/11FV 1 Status of “common crate” project. Events happened after the December meeting Quotations' story o 22.12.10 Bin (9ULHC version 2, 11U high,

Similar presentations


Presentation on theme: "09/02/11FV 1 Status of “common crate” project. Events happened after the December meeting Quotations' story o 22.12.10 Bin (9ULHC version 2, 11U high,"— Presentation transcript:

1 09/02/11FV 1 Status of “common crate” project

2 Events happened after the December meeting Quotations' story o 22.12.10 Bin (9ULHC version 2, 11U high, 21 positions 9U, 400mm in depth, without backplane, fan-tray 400mm - 2'075. EUR/pc Backplane 3U according to NA62 specification, minimum quantity 20 units - 696. EUR/pc Fan-tray 9U 400mm in depth - 627.- EUR/pc Power supply LHC 6U, +/-12V 46A, 48V 13.5A, +3.3V 30A, +5V 30A /-5V 30A - 3’871 EUR/pc Power supply LHC 9U, 48V 27A, +3.3V 100A, +5V 100A, +/-5V 100A - 3’295. EUR/pc o 13.01.11 Bin - 2'075. EUR/pc Backplane – 1 unit - 1’256. EUR/pc Backplane design and tooling – 3240 EUR/pc Fan-tray - 627.- EUR/pc Power supply LHC 9U, +/-12V 46A, 48V 13.5A, +3.3V 100A, +5V 100A,+/-5V 30A - 3’738 (3’871 ) EUR/pc Power supply LHC 9U, 48V 27A, +3.3V 100A, +5V 100A, +/-5V 100A - 3’295. EUR/pc VF2 09/02/11

3 Quotations' story - 2 o 14.01.11 Bin - 2'075. EUR/pc Backplane – 2 units - 988. (1’256.) EUR/pc >=20 units - 534. EUR/pc Backplane design and tooling – 3240 EUR/pc Fan-tray - 627.- EUR/pc Power supply LHC 9U, +/-12V 46A, 48V 13.5A, +3.3V 100A, +5V 100A,+/-5V 30A - 3’738 EUR/pc Power supply LHC 9U, 48V 27A, +3.3V 100A, +5V 100A, +/-5V 100A - 3’295. EUR/pc VF3 09/02/11

4 The order was sent on January 15 o 2 complete crates LAV FE (Antonella) LKr trigger (Andrea) Backplane design and tooling (Ferdi – common fund). This charges will be sheared among the future TEL62 buyers. o Design of the backplane will be agreed with the NA62 o The crates should be delivered in April All crate components are included in the PH-ESE technical database and can be ordered directly through it any time VF4 09/02/11