Download presentation
Presentation is loading. Please wait.
Published byMaria Arnold Modified over 9 years ago
1
Presented by E.G. Anassontzis University of Athens on behalf of NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title Mechanics for “km 3 ” neutrino telescope VLVνT Workshop
2
Modular system with built in redundancy “All” connections to be made in air Use ships of opportunity and non highly specialized surface vessels for deployment Use locally available transport vessels No use of bathyscaphs or ROVs Retrieval and expandable Inoxidable material Design consideration VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR
3
Inoxidable material Stainless steel > inoxidable > many alloys > sensitive in cavity corrosion > steel ropes and shackles Aluminium > special alloy > anodized Titanium > inoxidable > best > light and strong Plastics > PVC, Polyethylene > ropes Glass fibers > light and strong > water ingress? Glass > PMT > housing > inoxidable Material considerations VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR Isolation with plastic or rubber Titanium
4
NESTOR tower 32 m diameter 30 m between floors 144 PMTs 20 000 m 2 Effective Area for E>10TeV Energy threshold as low as 4 GeV NESTOR TOWER VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR with positioning transponders Anchor Unit with
5
Star CAD NESTOR star Alu star Optical Modules Titanium sphere Optical Modules Titanium sphere Tit star VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR
6
Loading a star VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR Loading a star
7
VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR Preparing a star
8
VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR Folded star
9
Full Machine Shop VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR
10
Full Machine Shop VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR
11
sphere VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR Titanium sphere
12
Sphere open VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR Titanium sphere open with electronics stand
13
Testing floor bay station below water VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR Star just below surface during tests
14
Floor below 2003 VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR Star just below surface during deployment
15
Pyramid schematic VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR Anchor Unit with Environmental Instrumentation
16
Pyramid schematic deck2003 VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR Anchor Unit with Environmental Instrumentation
17
Junction box, connectors sides VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR
18
Junction box, connectors sides VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR
19
JB box VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR
20
JB box with connectors on the side (simulation) VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR
21
Junction box data Data from a depth of 4000 m Environmental data from the Junction Box During deployment Since deployment VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR
22
March 2003 March 2003 VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR Successful deployment of one NESTOR star with 12 Optical Modules to 4000m using the cableship RAYMOND CROZE (FranceTelecom) 30 th of March: The first deep sea muon data transmitted to shore; through a 30km long electro-optical cable to the Methoni counting room March 2003
23
Pyramid deployment maersk VLVνT Workshop – 5-8 October 2003 – NIKHEF, Amsterdam NESTOR
24
end
25
NESTOR INSTITUTE
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.