1 Project to Develop GOES DCS User Requirements TWG Presentation By Ernest Dreyer October 28, 2009

2 Motivation Assess capability of GOES DCS to meet current and projected user requirements. Prepare short-term and long-term scenarios for meeting those requirements.

3 Approach Characterize the current system Document user requirements  Web questionnaire  Interviews where possible Develop short-term and long-term scenarios for satisfying user requirements

4 Characterize the Current System Provide an up-to-date description of the entire system  STIWG Operational Plan will be used as a starting point.  Included will be Update of system capabilities  Improvements at Wallops  Role of EDDN and other backups  Data Distribution  Inventory of DRGSs and LRGSs Future Developments  Narrow-band Conversion  Binary Transmission  DCP Command

5 Growth of GOES DCS

6 Users of GOES DCS 2000 2009

7 Document User Requirements Most users are adapting the current capabilities of the system to their needs Need to find out the “real” requirements for future planning – especially for determining needed capacity. This will possibly affect  additional satellite capabilities and  modes of operation

8 Examples Capacity Requirements for next 10 years  How many sites?  Types of sites? Mode of Operation  How many critical sites need data transmitted more frequently than 1 hour?  Can sites by categorized by transmission frequency? If so, perhaps the system should be organized around transmission frequency.  How would two-way communications affect the mode of operation

9 Develop scenarios for satisfying user requirements Evaluate requirements and develop scenarios for meeting them, e. g. capacity can be increased in the  short term Implementing binary format  intermediate term Implementing narrow-band scheme Changing mode of operation  long term Adding additional transponder to satellite

10 Actual and Projected Growth ( Projection is based on growth in last 10 years.)

11 Observations To accommodate 50,000 300-baud sites that transmit every hour in 10-second windows would require 140 channels. The current layout is  Self-timed channels 100/300 Baud172 1200 Baud10

12 Observations (cont.) Reducing the band width of each channel by ½ will double the capacity. If the projected growth turns out to follow the past 10 years, there should be additional capacity to try other modes of operation.  Channels for 15 minute transmissions  Channels for daily transmissions  Channels for use by DCP Command

13 Gather information  Try to contact as many players as possible either directly, by phone, or my email. This will include STIWG members for requirements Manufacturers for inventory and other input Others  Develop Web-based questionnaire for all other GOES DCS users Next Steps

14 Produce Reports  Will try to publish intermediate results on a Web site.  Expect to finish in late Spring. Contact Me  Welcome input at any time.  sedreyer@verizon.net Next Steps(cont.)

15 Start thinking about  Expansion of data collection network over next 10 years. Numbers per year  Types of sites and data collection requirements to include Importance of sites/type Estimate of number of sensors/type Desired mode of operation/type  Requirements for continuity of operations (COO). Homework