Presentation is loading. Please wait.

Presentation is loading. Please wait.

OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020 EUROPEAN FUNDS European Commission Representation in Bulgaria Sofia, 30.11.2015.

Similar presentations


Presentation on theme: "OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020 EUROPEAN FUNDS European Commission Representation in Bulgaria Sofia, 30.11.2015."— Presentation transcript:

1 OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020 EUROPEAN FUNDS European Commission Representation in Bulgaria Sofia, 30.11.2015

2 OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020 Priority Axis 1 Water 1.Construction of WSS infrastructure 2.Extension/optimization of quantitative monitoring networks and further development/optimization of the networks for control and operational monitoring of the groundwater chemical status 3.Development of new and update of existing strategic documents for the implementation of the Water Framework Directive and the Marine Strategy Framework Directive – River Basin Management Plans 2022-2027

3 OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020 Priority Axis 2 Waste Measures in accordance with the waste management hierarchy for municipal waste and for implementation of legislative requirements : Centers for re-use, repair and preparation for re-use; Installations for preliminary treatment of municipal waste; Anaerobic and/or composting installations; Installation for waste recovery – Third phase of the integrated Sofia Municipality’s project for municipal waste treatment; Demonstration/Pilot projects.

4 OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020 Priority Axis 3 Natura 2000 and Biodiversity Implementation of measures of the National Prioritized Action Framework for Natura 2000 Development and implementation of management approach for NATURA 2000 sites; Conservation measures for Natura 2000 species and natural habitats under the Habitats and Bird Directives; Development of Natura 2000 sites management plans; Complementing the establishment of Natura 2000; Information measures for NATURA 2000 network.

5 OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020 Priority Axis 4 Flood and Landslides Risk Prevention and Management 1. Establishment of National Real Time Water Management System 2. Studies and assessments related to the preparation of the Flood Risk Management Plans for the period 2022 – 2027 3. Establishment of six centers to increase the preparedness of the population for an adequate response to floods 4. Measures related to flood risk prevention and management solutions, including ecosystem-based approach - restoration of floodplains; improvement of water retentions; biological fortification of the river banks; protection infrastructure/water retention facilities/hydro-technical solutions 5. Measures for landslides risk prevention and management 6. Demonstration/Pilot projects

6 OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020 Priority Axis 5 Improvement of Ambient Air Quality Measures addressing air pollution from domestic heating and public transport, for example: Replacement of stationary individual and multi-family domestic combustion installations/ boilers on solid fuel; Installation of PM filters on individual domestic combustion installations; Measures for alternative heating, serving residential areas which consist of individual houses and/or small multi - family buildings using solid fuel for heating; Measures to reduce emissions from public transport vehicles including reduction of the use of conventional fuel in public transport; Replacement of the public transport vehicles exhaust systems (retrofitting).

7 OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020 FINANCIAL PLAN

8 OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020 PROCEDURES 2015/1

9 PROCEDURES 2015/2 OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020

10 PROCEDURES 2016/1 OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020

11 PROCEDURES 2016/2 OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020

12 POSSIBILITIES for the BUSINESS 1.Beneficiaries – contracting the implementation of the project 2.Business – implementing activities under a contract with the beneficiary; beneficiaries for waste management measures and under “air” priority 3.Bulgarian Public Procurement Act Public Procurement Agency – www.aop.bg orwww.aop.bg Beneficiary’s website 4.Ministry of Environment and Water – managing the Operational Programme Environment and providing the funding to the beneficiaries.

13 THANK YOU FOR YOUR ATTENTION ope@moew.government.bg www.ope.moew.government.bg OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020


Download ppt "OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020 EUROPEAN FUNDS European Commission Representation in Bulgaria Sofia, 30.11.2015."

Similar presentations


Ads by Google