Download presentation
Presentation is loading. Please wait.
Published byVirgil Bryant Modified over 9 years ago
2
BAM HEALTH NETWORK by Jan F. Brandejs PhD and Leslie D. Devlen 2004-11 ITC Software / Lejanix All rights reserved.
3
Background On the morning of 26 December 2003, at 05:28 hrs local time, a major earthquake measuring 6.5 on the Richter scale struck the city of Bam in the province of Kerman. The earthquake had a depth of only 10 - 12 kilometers and its epicenter was directly below Bam city. More than 43,000 people were killed and 30,000 injured. The earthquake destroyed 87% of the buildings in Bam city and left some 75,000 people homeless. A total of 18,000 buildings in Bam and surrounding villages were destroyed including 131 school buildings. 3 hospitals, 95 health centers and 14 rural health clinics were damaged or destroyed.
4
Identified Reconstruction General 255 bed hospital District health care management centre District health network expansion centre Emergency station Ten (10) Ambulances Ten Urban health centers Fourteen (14) Rural health centers Five (5) Urban health posts Ninety-five (95) Health houses (= basic unit for the delivery of health care)
5
Identified Reconstruction - continued Behvaz training center Faculty of nursing and paramedics (2,000 sq.meters) Dormitory for the faculty of nursing (1,500 sq.meters)
6
255 BED HOSPITAL Wards: Emergency, Internal Medicine, Pediatrics, Infants (Prenatal), Surgery, CCU/ICU, Orthopedics, Eye, ENT, Obstetrics & Gynecology, Radiology/DI, Laboratory, Pharmacy, Dialysis, Mental Health
7
255 BED HOSPITAL Introducing Patient Smart Card
8
255 BED HOSPITAL Patient Care Dataflow
9
255 BED HOSPITAL Information network
10
255 BED HOSPITAL LJX*CARE
13
District Health Care Management Center – The network manager
14
District Health Care Management Center – Network configuration HARDWARE: 40% Procurement Delivery Installation Maintenance training Spare parts SOFTWARE: 30%, covering Selection and testing Operating systems Database software Development tools Training and manuals Maintenance PROJECT MANAGEMENT: 10% STAFF TRAINING: 15% COMISSION FEES: 5%
15
Thank you for viewing our presentation! ITC Software Tel.: +1 978 287 4855 info@itcsoftware.com www.itcsoftware.com Thank you for viewing our presentation! ITC Software Tel.: +1 978 287 4855 info@itcsoftware.com www.itcsoftware.com
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.