Download presentation
Presentation is loading. Please wait.
Published byGladys Gilbert Modified over 9 years ago
1
Epic Pilot – Use Case 1 EHR PDMP HUB PDMP EHR Epic EHR Epic NCPDP 10.6 PDMP Hub OneHealthPort HIE PDMP Hub OneHealthPort HIE PMIX PDMP WA State Department of Health PDMP WA State Department of Health
2
Epic Pilot – Use Case 1 EHR PDMP HUB PDMP EHR Epic EHR Epic NCPDP 10.6 PDMP Hub Appriss PDMP Hub Appriss PMIX PDMP TBD (Looking for volunteers) PDMP TBD (Looking for volunteers)
3
Pilot Considerations Timeline –Long term project, completed in phases –First phase over next 2-3 months, then move to second phase Phased approach –Phase 1: Will work with WA PMP on proof of concept using NCPDP standards –Phase 2: Will work with multiple states, through PDMP HUB Final Specifications needed –Appriss (i.e. messaging formats, content structure, etc.) Potential risks –Compatibility with NCPDP 10.6 script and WA PMP Pilot Team Tim Stolldorf – Integration and Interface Engineer: tstolldo@epic.com tstolldo@epic.com Pilot Team Tim Stolldorf – Integration and Interface Engineer: tstolldo@epic.com tstolldo@epic.com
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.