Tom Canfield Engineering Technologies and Design POE 2.4.1 Medina County Career Center 1/3/2011
2
Design a bridge in WestPoint bridge builder. Minimal overall cost. If bridge is below 24m, excavation of river banks is required. The highest point must not exceed 8.5m above the river banks. Must be constructed of no more than 50 joints and no more than 120 members.
3
Bridge deck must be 10m wide to accommodate traffic. May choose from different member materials. May choose either hollow or solid members. Must be able to support its own weight along with a 480kN load from passing traffic.
4
Bridge can either have one lane or two lanes on the deck. The bridge must comply with safety provisions of the 1994 LRFD AASHTO Bridge Design Specification. Material densities Load combinations Tensile strength of members Compressive strength of members
5
Deck Elevation 8 meters- $75,200 High-Strength concrete- $5,000 Quenched Hollow tube- $32,764.18 Product cost- $6,000 Excavation cost- $67,000 Abutment cost- $24,800 Total cost- $165,764.18
10
This design of bridge was decided to be the final design because it was the cheapest and most versatile bridge design. it also follows all of the constraints listed in the design brief.