Presentation is loading. Please wait.

Presentation is loading. Please wait.

Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety Risk-based Acquisition.

Similar presentations


Presentation on theme: "Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety Risk-based Acquisition."— Presentation transcript:

1 Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety Risk-based Acquisition Management (RBAM) Update May 15-17, 2001 ARC Phil Napala Code QE Jeff Cullen Code HK (1)

2 Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety WHAT IS RISK-BASED ACQUISITION MANAGEMENT? The integration of risk management into the acquisition process. 2

3 Mission Success Starts With Safety February 13, 2001 (3) RISK MATRIX (HIGH RISKS ONLY) ACQUISITION STRATEGY PROCESS THE RBAM PROCESS REQUIREMENTS POST AWARD SOURCE SELECTION SOLICITATION DEVELOPMENT ACQUISITION STRATEGY DEVELOPMENT Government/ Contractor Negotiations (if necessary) CONTRACT SIGNING / RM PLAN RISK RANKING HIGH RISK MEDIUM RISK LOW RISK ACQUISITION STOPLIGHT CHART RISK WHEEL RBAM WORKSHEET

4 Mission Success Starts With Safety February 13, 2001 (4) RBAM Attendees by Center The charts below detail the number of individuals who received training at each center.

5 Mission Success Starts With Safety February 13, 2001 (5) Training Since October 2000 - - 122 people attended 8 sessions, 5 Workshops and 3 Tutorial Overview Sessions

6 Mission Success Starts With Safety February 13, 2001 (6) Acquisition Strategy Meeting Risk Assessment Summary R Y G Y SAFETY 3 Yellow MISSION SUCCESS n RISKS SCHEDULE n RISKS MANAGEMENT n RISKS COST n RISKS Y SECURITY n RISKS Envir, Safety, Health Management Security Tech Performance Schedule Cost SAFETY n RISKS MISSION SUCCESS n RISKS SCHEDULE n RISKS MANAGEMENT n RISKS COST n RISKS SECURITY n RISKS R Y Y G Y Requirement RisksAcquisition Strategy Risks YY

7 Mission Success Starts With Safety February 13, 2001 (7) RBAM Basics To do this, we are telling everyone to use a disciplined continuous risk management process: identify, analyze, plan, track, control, communicate and document.  Identify. Sit individuals down, and point out trouble areas.  Analyze. Engage brain, preferably before buying.  Plan. Before leaping, think landing.  Track. Keep tabs on your bets.  Control. Try not to do really stupid things.  Communicate. Be real when telling managers about risks.  Document. Write it down and don’t forget.

8 Mission Success Starts With Safety February 13, 2001 (8) Summary RBAM ties the money process to the safety and mission assurance process. Early application is showing practical benefit. Risks are being identified before announcements are let out on the street. Risk discussions required by the new procurement notice, have been healthy reality checks as new innovative and technically challenging NASA project acquisitions come up for review.


Download ppt "Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety Risk-based Acquisition."

Similar presentations


Ads by Google