Download presentation
Presentation is loading. Please wait.
Published byRose Hensley Modified over 9 years ago
1
ECHIDNA ® Pilot Study Mt Gambier: Objectives and Results Glenn Newnham & Darius Culvenor Ensis Forests David Jupp & Jenny Lovell CSIRO Marine & Atmospheric Research March 2006
2
ECHIDNA® Pilot Study Mt Gambier ECHIDNA ® Validation Instrument (EVI) Unique design: Full waveform digitising Full hemispherical scanning Variable beam divergence Deliberately over-engineered scientific instrument Single scan takes 3 – 20 mins 0.2 – 4 million individual laser pulses 200MB – 4GB of data Data interpretation currently office-based
3
ECHIDNA® Pilot Study Mt Gambier EVI Data: Waveforms
4
ECHIDNA® Pilot Study Mt Gambier Results – Heights ECHIDNA ® Validation Instrument Height Estimation Determine the height at which the mean waveform reaches the noise floor Slight negative bias
5
ECHIDNA® Pilot Study Mt Gambier Results – Heights EVI Predominant Height (PDH) computed from mean height Strong relationship to ForestrySA PDH Slight negative bias
6
ECHIDNA® Pilot Study Mt Gambier Other Outputs – Discrete Point Analysis
7
ECHIDNA® Pilot Study Mt Gambier Other Outputs – Discrete Point Analysis Digital Elevation ModelCanopy Elevation Model
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.