Presentation is loading. Please wait.

Presentation is loading. Please wait.

PWP A MENDMENT N O. PWP-4-CSB-14-0005-1 & R ELATED NOID S CSB-NOID-0003-14 & CSB-NOID-0004-14 C ALIFORNIA C OASTAL C OMMISSION S OUTH C ENTRAL C OAST D.

Similar presentations


Presentation on theme: "PWP A MENDMENT N O. PWP-4-CSB-14-0005-1 & R ELATED NOID S CSB-NOID-0003-14 & CSB-NOID-0004-14 C ALIFORNIA C OASTAL C OMMISSION S OUTH C ENTRAL C OAST D."— Presentation transcript:

1 PWP A MENDMENT N O. PWP-4-CSB-14-0005-1 & R ELATED NOID S CSB-NOID-0003-14 & CSB-NOID-0004-14 C ALIFORNIA C OASTAL C OMMISSION S OUTH C ENTRAL C OAST D ISTRICT S LIDE 1

2 I TEM XXX – CDP A PPLICATION N UMBER XXX S LIDE 2 V ICINITY M AP Santa Barbara City College I TEM – W21C, D & E

3 I TEM XXX – CDP A PPLICATION N UMBER XXX S LIDE 3 A ERIAL P HOTOGRAPH OF P ROJECT S ITE I TEM – W21C, D & E Location of New Classroom/Office Building Complex Existing Drama/Music Building

4 I TEM XXX – CDP A PPLICATION N UMBER XXX S LIDE 4 A ERIAL P HOTOGRAPH OF P ROJECT S ITE I TEM – W21C, D & E 2 Unpermitted Portable Storage Buildings to be Removed 3 Unpermitted Portable Classrooms to be Removed

5 I TEM XXX – CDP A PPLICATION N UMBER XXX S LIDE 5 A ERIAL P HOTOGRAPH OF P ROJECT S ITE Proposed Project Site for the New Classroom/Office Building Complex I TEM – W21C, D & E Existing Drama/Music Building

6 I TEM XXX – CDP A PPLICATION N UMBER XXX S LIDE 6 A ERIAL P HOTOGRAPH OF P ROJECT S ITE I TEM – W21C, D & E Location of New Classroom/Office Building Complex Existing Drama/Music Building

7 I TEM XXX – CDP A PPLICATION N UMBER XXX S LIDE 7 V IEW OF E XISTING D RAMA /M USIC B UILDING FROM B EACH Garvin Theater Roof 10 ft. Height Increase I TEM – W21C, D & E

8 I TEM XXX – CDP A PPLICATION N UMBER XXX S LIDE 8 A ERIAL P HOTOGRAPH OF P ROJECT S ITE I TEM – W21C, D & E Location of New Classroom/Office Building Complex Existing Drama/Music Building Shoreline Drive

9 I TEM XXX – CDP A PPLICATION N UMBER XXX S LIDE 9 B ICYCYLE F ACILTY I MPROVEMENTS I TEM – W21C, D & E Installation of new bike racks, bike sheds, and storage lockers to provide for a minimum of 111 new secured bicycle parking as part of West Campus Classroom/Office Facility Provision of free access to on-campus shower and locker facilities for use by bicycle commuters to campus. Construction and operation of a new on-campus bicycle shop that will provide bicycle rentals, used bicycle sales, parts, bicycle repairs by shop staff, and instruction on “do-it-yourself” repairs. Installation of three separate “do-it-yourself” bicycle repair stations. Designation and signage of all bicycle routes on campus.

10 I TEM XXX – CDP A PPLICATION N UMBER XXX S LIDE 10 A LTERNATIVE TRANSPORTATION PROGRAMS I TEM – W21C, D & E Implementation of a new online carpool match service for students and campus staff. A new campus-owned and operated vehicle sharing program for staff and faculty that will provide for a minimum of 1 electric vehicle, 1 hybrid vehicle, 5 electric bicycles, and 6 standard bicycles; in addition to provision of a service for emergency rides home on an as needed basis. New provisions requiring the College to maintain the six existing electrical car charging stations on campus and installation of a minimum of two additional charging stations per year, unless parking surveys demonstrate that the supply of charging stations is adequate to meet demand.

11 I TEM XXX – CDP A PPLICATION N UMBER XXX S LIDE 11 A LTERNATIVE T RANSPORTATION P ROGRAMS I TEM – W21C, D & E Implementation of a two-year pilot promotional campaign that provides non-cash incentives to students who commute to campus through the campus carpooling program or riding the bus. Implementation of another two-year pilot program that provides cash incentives to employees who commute to campus by choosing alternatives to single occupancy vehicle commuting. and implementation of a one-year pilot program to provide shuttle buses to campus from two designated off-campus parking locations to provide the necessary “Last Mile” linkage for commuters.

12 I TEM XXX – CDP A PPLICATION N UMBER XXX S LIDE 12 A ERIAL P HOTOGRAPH OF P ROJECT S ITE I TEM – W21C, D & E Location of New Classroom/Office Building Complex Existing Drama/Music Building Shoreline Drive


Download ppt "PWP A MENDMENT N O. PWP-4-CSB-14-0005-1 & R ELATED NOID S CSB-NOID-0003-14 & CSB-NOID-0004-14 C ALIFORNIA C OASTAL C OMMISSION S OUTH C ENTRAL C OAST D."

Similar presentations


Ads by Google