Hg Fate and Transport Within the San Jose/Santa Clara WPCP: Study Design and Interim Progress Report Item #4
3
Why? Baywide Hg TMDL Anything Special About POTW Hg? Do POTWs Methylate Hg? Where Does the Hg Go? NPDES Discharge Permit Provision Workplan (collection and analytical methods, schedule) Final Report (Hg F&T, Trends, Correlations, Evaluate Feasibility of CH 3 Hg Reduction Program) Item #4
4
Steps to Completion Method Development Workplan Literature Review Detailed SAP Phase 1 Sample Collection Study Optimization Phase 2 Sampling Final Report Item #4
5
Method Development
6
The Treatment Process (simplified)
7
Treatment Process
8
The Plan Phase 1 Weekly RS, PE, SS, NE, SE, FI, TFE, FE Total, Filtered, Total Methyl (Selected Filtered Methyl) TSS, Chloride, Sulfate, Sulfide DO, Temp, pH, Conductivity Monthly As above + Secondary/ Nitrification Quads Sludge Seasonal 24 hour sampling Monthly Item #4
9
The Plan Phase 2 Longer term, reduced frequency Monthly RS, PE, NE, SE, FI, TFE, TFBW, FE Weekly RS, FE Special Focused Studies More sludge? Composites? More 24 hour samples? Other parameters? Item #4
11
TSS (mg/L)
12
Item #4
14
* * * * * Addition of C l2 or H 2 O 2 Item #4
20
Mass Balance? Item #4
23
Interim Conclusions Efficiencies: –Hg TOT 99% –Methyl Hg 97% –Dissolved Hg 50% Removal correlated with solids removal No evidence of methylation Flows sufficient to account for removal Temporal bias (daily fluctuation) Item #4
24
Next Steps Continue baseline Phase II sampling Independent review of Phase I results Discuss with Water Board Optimize sampling to answer questions Carry out optimized sampling Final Report 2007 Item #4