NCSX Operation of the C1 Modular Coil in the Coil Test Facility Peer Review June1, 2006 NCSX.

Similar presentations


Presentation on theme: "NCSX Operation of the C1 Modular Coil in the Coil Test Facility Peer Review June1, 2006 NCSX."— Presentation transcript:

1 NCSX Operation of the C1 Modular Coil in the Coil Test Facility Peer Review June1, 2006 NCSX

2 June 1,20062 C1 Operation Review Objective The objectives of this review are to consider: –Installation of the C1 in the CTF –Instrumentation and Data Acquisition –Test Plan

3 NCSX June 1,20063 Close Quarters The New Cryostat Mostly Fills The Test Enclosure

4 NCSX June 1,20064 ES&H Changes Magnetic field exposure for personnel is slightly higher for the C1 test. The barrier distance increases from 15 feet to 23 feet. The C1 cryostat is large enough to impede access to and egress from the test enclosure. Three access doors allow entrance to the enclosure with necessary procedure changes (RLM: von Halle). –May become classified as a Confined Space

5 NCSX June 1,20065 C1 Installation 304 stainless steel legs (SE144-030)for strength –One leg fixed in X&Y, three on roller supports EM loads on baseplate for boil-off reservoir require tie- downs

6 NCSX June 1,20066 Coil Flow Diagram The C1 Coil Has Been Plumbed As 9 Separate Single-Phase Flow Paths and One Two-Phase Supply For The Lead Block Bleeds

7 NCSX June 1,20067 The Plumbing B-Plan Teflon tubing with Swagelok joints and custom backing inserts were not reliable –40 psig was the best pressure achieved –The previous style of insulating G-10 pipe nipples will be used in the plumbing

8 NCSX June 1,20068 Bus Conductor 500 MCM Welding Cable Insulated with Teflon FEP Shrink Tubing Has Successfully Been Tested to 58 kV

9 NCSX June 1,20069 Bus Bracing A Robust Support Has Been Fabricated To Both Partially Relieve The Leads From Load And To React Bus- Bus Forces Clamping force of 11300 N/m or 65 lbf/in is required on close conductors D. Williamson has asserted that the coil leads are not particularly fragile

10 NCSX June 1,200610 Lead Insulation Maximum voltage across coil is expected to be approximately 499 volts –The G11CR lead sleeves designed and machined for the production coils are being used for this test set-up

11 NCSX June 1,200611

12 NCSX June 1,200612

13 NCSX June 1,200613

14 NCSX June 1,200614

15 NCSX June 1,200615

16 NCSX June 1,200616

17 NCSX June 1,200617

18 NCSX June 1,200618 Test Objectives Main purpose – calibrate FE models with actual data –Improves confidence with which models can be used for future what-if inquiries. Secondary purpose – assess cooldown/recovery performance from ambient temperature and after pulses

19 NCSX June 1,200619 Dimensional/Deflection Measurements 3 measurement approaches –Extensive strain gauge array –Mechanical displacement measurement –Manual measurement of total width of both winding packs before and after

20 NCSX June 1,200620 Strain Gauge Locations 15 of K. Freudenberg’s 20 requested locations are instrumented

21 NCSX June 1,200621 Mechanical Measurement Box Dimensions are 94” X 116.5” ID with wall thickness of 6” Three tubes needed 1.9.5 foot outer tube ss tube,.875 OD,.675” ID. (purchased) 2.8 inch ss tube (box entrance).75” OD,.6875” ID 3.10 foot inner ss tube ¼ diameter Three angles needed (2” X 3”) (.1875 thick). These may be from local boat supply store. (Tentatively purchased two anchors.)

22 NCSX June 1,200622 Thermal Measurements Extensive strain gauge and t/c data collection system V/I resistance inference –This is a key feature as it is prototypical of the first-plasma machine protection scheme –ADMINISTRATIVE control of coil temperature through resistance value (wait for next pulse until cool)

23 NCSX June 1,200623 Temperature Differentials Fiberglass convection insulation will be installed on coil with fiberglass rope Only outer aspect of coil will be exposed to cooling Two T/C’s will be installed near the winding packs on coolant tubes. The resulting temperatures will be used to monitor the deltaT between the windings and the MCWF. A 50C difference has been recommended.

24 NCSX June 1,200624 Test Sequence –Lift the both ends of the cable bus assembly and megger pole-pole to 3 kV –Restore the bus at the coil end and megger the warm coil to ground to 7.5 kV –Completely restore the bus and measure the warm circuit resistance from the rectifier room –Collect winding pack width data prior to cool-down –Cool the coil to ~80K with proper data collection

25 NCSX June 1,200625 Test Sequence (cont.) –Measure the cold circuit resistance from the rectifier room –Perform basic shot sequence with T/C, strain archival and V/I cooldown checks –Warm up to install mechanical measurement rig –5 kA room temperature pulse for K.F. –Cool down, repeat shot sequence, collect previous data plus displacements –Warm up facility –Measure final winding pack dimensions

26 NCSX June 1,200626 Current Waveforms for Test The 2T Scenario from the Rev. 4 GRD offers 36.5 kA with an I**2t of 1.15e9 a**2sec.

27 NCSX June 1,200627 Protective Circuitry Protective Settings –Maximum “On” time – 2.3 seconds - no change from TRC –Tau (thermal) – 200 seconds – no change –Minimum cycle time – 900 seconds – no change –I**2t max – 1.6e9 a**2sec – no change –Imax – 38.5 kA up from 33 kA

28 NCSX June 1,200628