Las Delicias, El Salvador Water Supply Project Implementation Proposal Phase I Trip Dates: May 2012 Presented to TAC: March 7, 2012
2
EXTRA SLIDES
3
Piping System Layout New Pipelines Supply Line 1 to new tank (A-B-C) – Length = 365 m + tank connection (assume + 10 m) = 375 m – 1 bend, 1 tee, 3 elbow, 2 valves, 1 exit – 17 m elevation rise + tank height – Hill rises to 643 m then valley falls t0 640 m on connecting road (D-B) – ~175 gpm flowrate Distribution line connection 2a from lower Tramo 3b to lower Tramo 6 (E-F) – 105 m length, elevation change unclear, guess 10 m drop Distribution connection 2b from upper Tramo 3b to upper Tramo 6 (B-D) – 120 m length, 8 meter drop with low point at 640 m (3 m below D) Distribution line 2c from new tank to new connections (C-B-E) – 255 m length, 11 meter elevation drop Waypoints PointLocationElevation ACalle Principal638 m BIntersection at Field 651 m CNew tank655 m DEnd of upper Tramo 6 643 m EEnd of lower Tramo 3b 640 m FEnd of lower Tramo 6 ?? Guess 630 m
4
Proposed update to Water System (section relevant for EWB-MAP modifications) RED lines – supply lines to tank (uphill by pump) BLUE lines – distributions lines by gravity NEW SUPPLY LINE 1 NEW TANK A B C 105 m 20 m 240 m DOWNHILL
5
Design of Valve Boxes from a prior EWB project Adjust Dimensions based on local conditions For Single 4” pipe
6
Thrust Anchor Dimensions Based on 4” PVC PIPE 50 cm Trench Depth Height of Anchor 25 cm Length of Anchor Backing against undisturbed material: 90° BEND: L = 80 cm 45° BEND: L = 40 cm Tee: L = 40 cm