T-76.4115 Iteration Demo Apollo Crew PP Iteration 21.10.2008
2
T-76.4115 Iteration demo 2 Agenda Project status (10-15 min) achieving the goals of the iterationachieving the goals of the iteration project metricsproject metrics Work results (20-25 min) project planproject plan requirementsrequirements architectural planarchitectural plan UI conceptsUI concepts Used work practices (5 min)
3
T-76.4115 Iteration demo 3 Introduction to the project Source: Dipoli entrance hall
4
T-76.4115 Iteration demo 4 Introduction to the project Client: Design Factory Project: Information & reservation system Welcome visitorsWelcome visitors Guide and assist visitorsGuide and assist visitors Manage eventsManage events Workspace reservation systemWorkspace reservation system System will work in Design Factory’s entrance hall and via web. Project also includes testing some new devices such as touch screen.
5
T-76.4115 Iteration demo 5 Status of the iteration’s goals Project planning on high level, PARTLY OK - still needs some work (especially QA plan) Contact all relevant stakeholders, OK Understanding the domain and what customer really needs, OK Document requirements on high level and specify most important features and use cases, OK Make needed infrastructure available, IN PROGRESS - because of delays Getting ready for implementation, PARTLY OK Identify group's skills, interests and motivation, OK Create supportive and inspiring atmosphere, OK
6
T-76.4115 Iteration demo 6 Status of the iteration’s deliverables Project plan OK, QA plan will be delivered in the beginning of I1OK, QA plan will be delivered in the beginning of I1 Requirements document OK, Requirements are on a general levelOK, Requirements are on a general level Internal deliverables Preliminary architectural plan: structure and modules, IN PROGRESSPreliminary architectural plan: structure and modules, IN PROGRESS System skeleton, APIs and minimal working system, IN PROGRESSSystem skeleton, APIs and minimal working system, IN PROGRESS Preliminary UI concept, OKPreliminary UI concept, OK Instructions and guidelines for development, OKInstructions and guidelines for development, OK Assignments for learning development tools and methods, OKAssignments for learning development tools and methods, OK Most critical UC descriptions and diagrams, OKMost critical UC descriptions and diagrams, OK
7
T-76.4115 Iteration demo 7 Realization of the tasks
8
T-76.4115 Iteration demo 8 Resource usage (1/2) Planned hours Realized hours (20.10.2008)
9
T-76.4115 Iteration demo 9 Resource usage (2/2)
10
T-76.4115 Iteration demo 10 Changes to the project No major changes have been made
11
T-76.4115 Iteration demo 11 Risks (1/2): TOP 5
12
T-76.4115 Iteration demo 12 Risks (2/2) Materialized risks Delay of virtual servers have really impacted progress, impacts:Delay of virtual servers have really impacted progress, impacts: Time tracking Installation of development environment QA environment Might have some implications in the beginning of I1
13
T-76.4115 Iteration demo 13 Results of the iteration Project plan Requirements Architectural plan UI concepts
14
T-76.4115 Iteration demo 14 Project plan Organization and other resources Schedule Goals Customer’sCustomer’s Group’sGroup’s Project plan still need to be approved by the customer
15
T-76.4115 Iteration demo 15 Project plan: project organization
16
T-76.4115 Iteration demo 16 Other resources Need Graphical designer / ADGraphical designer / AD Usability designerUsability designer Possible sources TAIKTAIK Lahden Design FoundationLahden Design Foundation Design Factory’s own personnelDesign Factory’s own personnel
17
T-76.4115 Iteration demo 17 Project plan: schedule
18
T-76.4115 Iteration demo 18 Project plan: customer’s goals
19
T-76.4115 Iteration demo 19 Project plan: group’s goals
20
T-76.4115 Iteration demo 20 Requirements (1/2) Four main domains BackendBackend Guide systemGuide system Screen control systemScreen control system Event management system (workspace reservation system)Event management system (workspace reservation system) 9 UC descriptions 8 non-functional requirements 1 constraint Requirements still needs to be approved by the customer
21
T-76.4115 Iteration demo 21 Requirements (2/2): Preliminary data model
22
T-76.4115 Iteration demo 22 Architectural plan: system environment
23
T-76.4115 Iteration demo 23 UI concepts Touch screen UI https://wiki.tkk.fi/display/apollocrew/UI+concepthttps://wiki.tkk.fi/display/apollocrew/UI+concepthttps://wiki.tkk.fi/display/apollocrew/UI+concept Big screen UI https://wiki.tkk.fi/display/apollocrew/UI+concepthttps://wiki.tkk.fi/display/apollocrew/UI+concepthttps://wiki.tkk.fi/display/apollocrew/UI+concept Web UI Html-demo: http://users.tkk.fi/~ttaura/apollo/Html-demo: http://users.tkk.fi/~ttaura/apollo/http://users.tkk.fi/~ttaura/apollo/
24
T-76.4115 Iteration demo 24 Used work practices Keep Joint meetings on WednesdaysJoint meetings on Wednesdays Team spiritTeam spirit Active communication by emailActive communication by email Workspace at Design FactoryWorkspace at Design Factory Problems Time trackingTime tracking Other tasks take time from this projectOther tasks take time from this project Wiki isn’t good in following project’s developmentWiki isn’t good in following project’s development Forum is missing and IRC doesn’t work that well in communicationForum is missing and IRC doesn’t work that well in communication Try Members reserve certain time slot only for this projectMembers reserve certain time slot only for this project More defined agendas and memos for Wednesdays meetingsMore defined agendas and memos for Wednesdays meetings Shorter meetings via IRC that everyone doesn’t have to come to OtaniemiShorter meetings via IRC that everyone doesn’t have to come to Otaniemi
25
T-76.4115 Iteration demo 25 Questions and comments? Thank you!