Presentation is loading. Please wait.

Presentation is loading. Please wait.

GLAST LAT Project Technical/Cost/Schedule Review 06/30/05 4.1.9 - Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.

Similar presentations


Presentation on theme: "GLAST LAT Project Technical/Cost/Schedule Review 06/30/05 4.1.9 - Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule."— Presentation transcript:

1 GLAST LAT Project Technical/Cost/Schedule Review 06/30/05 4.1.9 - Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule Review 06/30/05 Elliott Bloom SU-SLAC Subsystem Manager Ken Fouts SU-SLAC Subsystem Engineering Manager elliott@slac.stanford.edu, kfouts@slac.stanford.edu 650-926-2469 650-926-2553 Gamma-ray Large Area Space Telescope

2 GLAST LAT Project Technical/Cost/Schedule Review 06/30/05 4.1.9 - Integration and Test 2 Last Month's Accomplishments (1 of 3) Management –Tracking hardware shortages for LAT integration. –TKR Delivery –ELX Boxes –Procedure Status –69 of 70 submitted for sign-off or released IFCT –Completed 4 tower tests. –Completed I&T receiving tests on 3 TKR’s, 11 CAL’s and 3 TEM’s. –Completed assembly, checkout and installation of the grid cooler (aka the Chilla from Manila). –Completed installation of 2 additional towers for a total of 6 towers installed in the grid. –Completed alignment survey of 6 towers. –Preparations complete for 6 tower tests. –Completed shear plate and cable tray installation at four towers.

3 GLAST LAT Project Technical/Cost/Schedule Review 06/30/05 4.1.9 - Integration and Test 3 Last Month's Accomplishments (2 of 2) Online –LATTE Supported VSC software Python interface implementation Exploratory work in progress to demonstrate interaction with the VSC and its software interface 4.9.0 released for ACD –Initiated by ACD-discovered bug –Bug fixes, Trigger GUI, GPIB support –Updated HippoDraw correcting memory leaks –Updated trigger GUI to address concerns raised in trigger meeting –Bug fix for incorrectly initialized TEM BUSY_LRS_MASK register (measures TEM deadtime) Housekeeping multi-pen strip-chart GUI V2.0 deployed to clean room for real-time monitoring. E-logbook Version 3.4.1 released (minor bug fixes with corresponding tutorial and documentation updates)

4 GLAST LAT Project Technical/Cost/Schedule Review 06/30/05 4.1.9 - Integration and Test 4 I&T Activities Grid Chiller Unit Installation Grid Cooling Six CAL/TEM’s Installed Six Towers in the Grid

5 GLAST LAT Project Technical/Cost/Schedule Review 06/30/05 4.1.9 - Integration and Test 5 I&T NCRs by Month Open/Closed Status Month NCR Opened Current Status As of June 29 th Previous Month NCR Summary 22 Open 45 Closed

6 GLAST LAT Project Technical/Cost/Schedule Review 06/30/05 4.1.9 - Integration and Test 6 Procedure Status 70 documents total 69 latest versions submitted for sign-off 67 are released

7 GLAST LAT Project Technical/Cost/Schedule Review 06/30/05 4.1.9 - Integration and Test 7 Procedure Status (1 of 1) – Management

8 GLAST LAT Project Technical/Cost/Schedule Review 06/30/05 4.1.9 - Integration and Test 8 Upcoming I&T Events –CAL/TEM Installation in Bay 5 (Complete) –CAL/TEM Installation in Bay 1 (Complete) –4 Tower Tests (Complete) –Receive TEM/TPS 3 and 4 (Complete) –Receive TKR 4 (Complete) –STR #14, 15 ECD 7/5 –SVAC data taking for 6 towers ECD 7/15

9 GLAST LAT Project Technical/Cost/Schedule Review 06/30/05 4.1.9 - Integration and Test 9 I&T Detail Schedule (1 of 3)

10 GLAST LAT Project Technical/Cost/Schedule Review 06/30/05 4.1.9 - Integration and Test 10 I&T Detail Schedule (2 of 3)

11 GLAST LAT Project Technical/Cost/Schedule Review 06/30/05 4.1.9 - Integration and Test 11 I&T Detail Schedule (3 of 3)

12 GLAST LAT Project Technical/Cost/Schedule Review 06/30/05 4.1.9 - Integration and Test 12 I&T 6 Month Look Ahead (1 of 2)

13 GLAST LAT Project Technical/Cost/Schedule Review 06/30/05 4.1.9 - Integration and Test 13 I&T 6 Month Look Ahead (2 of 2)

14 GLAST LAT Project Technical/Cost/Schedule Review 06/30/05 4.1.9 - Integration and Test 14 SAS Interfaces SVAC is happy with CCB process –Thanks Richard Code release is getting more stable and reliable –Working with SAS to sharpen validation procedures –specially calibrations Pipeline issues are more infrequent –We expect to transition into a more robust architecture in a not so distant future –Ought to be tailored to the ISOC needs

15 GLAST LAT Project Technical/Cost/Schedule Review 06/30/05 4.1.9 - Integration and Test 15 Data Analysis Issues (up to 4 tower data) Hardware failures or problems –None so far !!! Kudos to the “royal we” Anomalies in offline distributions –Becoming less frequent and mostly due to –Incorrect configurations (mostly operational procedures) –Mistakes in the offline data analysis codes Understanding how the instrument works –Requires a much broader knowledge of –Integrated detector system functions and performance –LAT configuration (needs to be configuration controlled) –Details of complex offline software –How the analysis parameter space changes as we add more towers

16 GLAST LAT Project Technical/Cost/Schedule Review 06/30/05 4.1.9 - Integration and Test 16 Feedback to Operations: Procedures SVAC automated reports identified that GEM was not reporting trigger information properly for some of the 4 tower tests Action –stopped data taking to investigate root cause (Eduardo) Root cause –incorrect power up of system –found by Horwitz and confirmed by Huffer Recommendation to I&T –Improve procedures –Introduce online control plots during data taking

17 GLAST LAT Project Technical/Cost/Schedule Review 06/30/05 4.1.9 - Integration and Test 17 Understanding Performance: Deadtime Warren Implemented an offline variable to measure time without being affected by roll over of counter Measured deadtime in several configurations –Working to understand numbers

18 GLAST LAT Project Technical/Cost/Schedule Review 06/30/05 4.1.9 - Integration and Test 18 Do we have enough data yet? One tower Two towers –End-to-end cosmic ray data –To exercise trigger and data flow capabilities –SVAC cosmic ray data –To perform calibrations –To do performance studies that require large statistical sample Four towers to Sixteen towers (prior to ACD integration) –Only planned to collect SVAC data –May request some tests (most likely between 6 and 8 towers) to –Configure the instrument to take data with 2 Trigger Engines (simulate on-orbit operation) –Study nominal/high rates with TEM diagnostics OFF –Understand TKR one-shot behavior –Study TKR cable FIFO errors (caused by induced showers)

19 GLAST LAT Project Technical/Cost/Schedule Review 06/30/05 4.1.9 - Integration and Test 19 Issues & Concerns ISSUES Availability of flight assembly hardware. –Shortages identified by I&T and being worked with Subsystems. Flight Cables –TKR –SIU & EPU CONCERNS Additional I&T manpower for Online, SVAC and IFCT. TPS rework and replacement, availability for future tower installations.

20 GLAST LAT Project Technical/Cost/Schedule Review 06/30/05 4.1.9 - Integration and Test 20 Cost/Schedule Reports for Presentation May 2005 Month End 4.1.9 Integration & Test Gamma-ray Large Area Space Telescope

21 GLAST LAT Project Technical/Cost/Schedule Review 06/30/05 4.1.9 - Integration and Test 21 Level 3 Milestone Count

22 GLAST LAT Project Technical/Cost/Schedule Review 06/30/05 4.1.9 - Integration and Test 22 Level 3 Milestone List

23 GLAST LAT Project Technical/Cost/Schedule Review 06/30/05 4.1.9 - Integration and Test 23 Milestone Variance Explanation Schedule Impact –30 days due to late delivery of hardware Cost Impact –No cost impact Corrective Action –Evaluate system level test definition and durations. –Use 7/24 schedule as required for system level test to minimize test duration.

24 GLAST LAT Project Technical/Cost/Schedule Review 06/30/05 4.1.9 - Integration and Test 24 Cost Report

25 GLAST LAT Project Technical/Cost/Schedule Review 06/30/05 4.1.9 - Integration and Test 25 Cost Variance Explanation Why overrun/underrun? –Fly away instrumentation costs haven’t been recorded –Vacations What will be done to correct? –No action required

26 GLAST LAT Project Technical/Cost/Schedule Review 06/30/05 4.1.9 - Integration and Test 26 FTE Report (DOE/NASA-funded only)

27 GLAST LAT Project Technical/Cost/Schedule Review 06/30/05 4.1.9 - Integration and Test 27 FTE Variance Explanation Why overrun/underrun? –Vacations What is the impact? –None –Potential future impact when hardware arrives. What will be done to correct? –Moving 1 FTE from ELX to I&T –Hire production control person.


Download ppt "GLAST LAT Project Technical/Cost/Schedule Review 06/30/05 4.1.9 - Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule."

Similar presentations


Ads by Google