Presentation is loading. Please wait.

Presentation is loading. Please wait.

A WEALTH OF INFORMATION REHAB / REPAIR. CONTRACTORS ADVICE CALL HIM - DON’T EMAIL YOU PREPARE FOR PHONE CALL DO NOT CALL WHILE DRIVING “TAKE NOTES!” CALL.

Similar presentations


Presentation on theme: "A WEALTH OF INFORMATION REHAB / REPAIR. CONTRACTORS ADVICE CALL HIM - DON’T EMAIL YOU PREPARE FOR PHONE CALL DO NOT CALL WHILE DRIVING “TAKE NOTES!” CALL."— Presentation transcript:

1 A WEALTH OF INFORMATION REHAB / REPAIR

2 CONTRACTORS ADVICE CALL HIM - DON’T EMAIL YOU PREPARE FOR PHONE CALL DO NOT CALL WHILE DRIVING “TAKE NOTES!” CALL ASAP & CALL BEFORE VIEWING PROPERTY

3 INFO TO GATHER AT PROPERTY TAKE DISTANT PICTURES OF ENTIRE FRONT OF HOUSE ( TREE FREE ) ENTIRE SIDE OF HOUSE ENTIRE REAR OF HOUSE ENTIRE PROPERTY ACROSS STREET DISTANT BACK YARD ROOF HEATER DISTANT KITCHEN, BATH AND GARAGE ENTERING HOUSE AT FRONT DOOR

4 PRICING AVERAGE FULL REHAB- $35K-$50K NOT INCLUDING HVAC, ROOF, BAD DRYROT DO BIG TICKET ITEMS FIRST THEN DECIDE WHAT YOU CAN AFFORD TO SPEND REMAINING FUNDS ON VERY ROUGH AVERAGE REHAB $30-$35/SQFT BID OUT ALL WORK THEN REVISE TO FIT BUDGET

5 HIRING A CONTRACTOR MUST BE LICENSED, BONDED AND INSURED ASK TO SEE CSLB CARD (MUST CARRY) CHECK ID TO VERIFY NAME TYPE LIC # INTO CSLB WEBSITE (30 SEC) CHECK FOR ISSUES, VALIDITY AND CORRECT NAME

6 CONTRACT/PAYMENTS CONTRACTOR MUST PROVDE A CONTRACT SIGNED BY YOU AND HIM DETAILED SCOPE OF WORK MATERIAL ALLOWANCES MAX DEPOSIT $1000 WEEKLY PROGRESS PAYMENTS FOR % OF WORK COMPLETED START AND APPROX COMPLETION DATE

7 CONTRACT/PAYMENTS CONTINUED MEET WITH CONTRACTOR TO PICK MATERIALS (IN WRITING) WITH ADVICE KEEP IT SIMPLE-YOU AREN’T LIVING THERE CONTRACTOR SUPPLIES MATERIALS CONTRACTOR PULLS PERMIT LEAVE 10% RETAINER UNTIL JOB IS COMPLETE TURNKEY CONTRACTOR HANDLES EVERYTHING CONTRACTOR SHOULD STAY IN CONTACT AND SEND PICTURES

8 ADVICE FREE ESTIMATES ON CONTRACTORS SCHEDULE OR PAY HIM FOR HIS TIME AND GET IT ASAP 2 WALKTHROUGH BIDS AND LEARN!!!! THIS PROCESS IS DESIGNED TO SAVE YOU MONEY AND LEARN THE PROCESS DO MOST OF DRYROT REPAIR BEFORE PEST INSPECTION TO AVOID SCARY REPORT

9 MISTAKES TO AVOID NOT HAVING UTILITIES ON AND USABLE FOR CONTRACTOR VOLUNTEERING TMI AT BUILDING DEPT OR WITH INSPECTORS NOT HAVING PROPERTY INSURED SEPTIC OR SEWER? WATER UNDER HOUSE? 2 BLUETOOTHS OR SPEAKERS DOESN’T WORK NOT BUILDING YOUR TEAM


Download ppt "A WEALTH OF INFORMATION REHAB / REPAIR. CONTRACTORS ADVICE CALL HIM - DON’T EMAIL YOU PREPARE FOR PHONE CALL DO NOT CALL WHILE DRIVING “TAKE NOTES!” CALL."

Similar presentations


Ads by Google