Presentation is loading. Please wait.

Presentation is loading. Please wait.

WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting.

Similar presentations


Presentation on theme: "WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting."— Presentation transcript:

1 WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting

2 WWSWWS WWS Report, ILCSC, Dubna, 6/4/082 Report of the World Wide Study LoI Team Workshops Cooperation with CLIC efforts ECFA08 Workshop next week LCWS08 in Chicago - November Reacting to Funding Crises in UK & US P5 Report Role of WWS in RD era

3 WWSWWS WWS Report, ILCSC, Dubna, 6/4/083 14-16 January 2008 ILD Workshop DESY, Zeuthen

4 WWSWWS WWS Report, ILCSC, Dubna, 6/4/084 Kickoff of merger LDC+GLD 120 participants 14-16 January 2008 ILD Workshop DESY, Zeuthen http://ilcagenda.linearcollider.org/conferenceDisplay.py?confId=2389

5 WWSWWS WWS Report, ILCSC, Dubna, 6/4/085 Successful advances in preparing for LoI and technical design effort ~ 65 participants 14-16 April 2008 SiD Workshop RAL, Abingdon

6 WWSWWS WWS Report, ILCSC, Dubna, 6/4/086 WWS and CLIC Discussion on cooperation between ILC and CLIC detector groups –February meeting at CERN –Participation and talk at SiD Workshop - April –Participation and talk at ECFA08 next week 3 LoI groups have chosen contacts to CLIC WWS tools valuable to CLIC studies CERN engineering to support LoIs Studies on higher energy helpful to ILC groups

7 WWSWWS WWS Report, ILCSC, Dubna, 6/4/087 ECFA Workshop, Warsaw > 170 registrants Opening session includes –Barry on “Path Forward” and “Critical Points of Contact Between GDE and P&D” –Rolf on a “European Vision” –Sakue on the “New Organization” First meeting of IDAG –Plenary presentations by LoI groups –Closed discussions with each group Detector Performance –Including CLIC LHC-ILC Strategy to be discussed in plenary

8 WWSWWS WWS Report, ILCSC, Dubna, 6/4/088 LCWS2008 Conveners being nominated, to be recruited soon

9 WWSWWS WWS Report, ILCSC, Dubna, 6/4/089 Funding Challenges in US and UK UK –recovery for detector effort more difficult than for machine –go generic - connect to CLIC work US –Uncertainty in DOE/NSF response to P5 HEPAP approved P5 recommendation of more funding for detector R&D both DOE and NSF are considering the report –Generic aspects of detector R&D important –Engineering support for LoIs currently restricted –LoI process requires strong lab (Fermilab/SLAC) participation - uncertain, difficult in current climate

10 WWSWWS WWS Report, ILCSC, Dubna, 6/4/0810 P5 Report The panel recommends for the near future a broad accelerator and detector R&D program for lepton colliders that includes continued R&D on ILC at roughly the proposed FY2009 level in support of the international effort. This will ensure a significant role for the US even if the ILC is built overseas. The panel also recommends R&D for alternative accelerator technologies, to permit an informed choice when the lepton collider energy is established. The panel also recommends an R&D program for detector technologies to support a major US role in preparing for physics at a lepton collider. Approved by HEPAP, May 29, 2008

11 WWSWWS WWS Report, ILCSC, Dubna, 6/4/0811 Role of WWS in RD Era Many WWS activities are being transferred to RD –eg. Roadmap planning, MDI studies, Detector R&D coordination, etc. –WWS co-chairs are serving as initial RD regional contacts WWS is the community (like user group) WWS should –Cooperate with RD –Organize workshops WWS is evolving into new role

12 WWSWWS WWS Report, ILCSC, Dubna, 6/4/0812 Conclusion LoI groups are hard at work developing integrated detector designs in support of the GDE machine design effort –Demonstrate realistic detector performance –Address machine detector interface issues Uncertainty regarding long term impact of funding cuts in UK and US


Download ppt "WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting."

Similar presentations


Ads by Google