Microprocessor Relay Protection Jasvinder Blah & Naveen Manikarnika
2
Agenda Transformer Protection Electromechanical Relays Microprocessor Relays Relay Characteristics & Testing
4
got relays?
5
Relay Protection What is Relay Protection? Typical transformer protection: 51N8751V 596787N
6
Primary Protection - 87 Kirchhoff's Current Law i1i1 i2i2 i3i3 i4i4
7
Transformer Protection BKR (3) 3000/5A To 13kV Bus Transformer: 68kV/13.8kV
8
Electromechanical Relays
9
Microprocessor Relays
10
ADVANTAGES All elements and phases in one box Self-checking and alarm Internal compensation Oscillography and SER Direct Tripping DISADVANTAGES Technology advancing in a fast pace Firmware defects/upgrades
11
11 Delta - Wye I AB I BC I CA I a’ I b’ I c’ 30 º Secondary Currents Lags the Primary by 30 Degrees A B C a’ b’ c’ A B C I a’ I c’ I b’
12
Electromechanical CT Compensation
13
Microprocessor CT Compensation
14
CT Compensation
15
Internal Phase Compensation A B C -I b’ Ia’Ia’ Ic’Ic’ Ib’Ib’ 30 º I a ’-I b ’ Ia (Comp) = Ib (Comp) = Ic (Comp) = I a(comp)
16
Transformer Protection with Microprocessor Relays BKR 8751N51V 596787N (3) 600/5A (3) 3000/5A (1) 1200/5A (3) CCVTs 72.5kV/67.08V (3) PTs 14,400V/120V Incoming 69kV Feeder To 13kV Bus Transformer: 68kV/13.8kV SEL-487E
17
87 Percent Differential Extended Security Mode
18
87 Testing
19
Microprocessor Relay Testing Dual RS-232 Output Contacts Current Inputs Voltage Inputs ABCABC
20
87 – Differential BKR 8751N51V 596787N (3) 600/5A (3) 3000/5A (1) 1200/5A (3) CCVTs 72.5kV/67.08V (3) PTs 14,400V/120V Incoming 69kV Feeder To 13kV Bus Transformer: 68kV/13.8kV SEL-487E Initiate DTT Initiate BKR Failure Timer Pop Quiz !!!
21
87N – Neutral Differential BKR 8751N51V 596787N (3) 600/5A (3) 3000/5A (1) 1200/5A (3) CCVTs 72.5kV/67.08V (3) PTs 14,400V/120V Incoming 69kV Feeder To 13kV Bus Transformer: 68kV/13.8kV SEL-487E Initiate DTT Initiate BKR Failure Timer
22
51N – Neutral Overcurrent BKR 8751N51V 596787N (3) 600/5A (3) 3000/5A (1) 1200/5A (3) CCVTs 72.5kV/67.08V (3) PTs 14,400V/120V Incoming 69kV Feeder To 13kV Bus Transformer: 68kV/13.8kV SEL-487E Trip Bus-Tie Breaker
23
51V – Voltage Controlled Overcurrent BKR 8751N51V 596787N (3) 600/5A (3) 3000/5A (1) 1200/5A (3) CCVTs 72.5kV/67.08V (3) PTs 14,400V/120V Incoming 69kV Feeder To 13kV Bus Transformer: 68kV/13.8kV SEL-487E Trip Bus-Tie Breaker
24
67 – Directional Overcurrent BKR 8751N51V 596787N (3) 600/5A (3) 3000/5A (1) 1200/5A (3) CCVTs 72.5kV/67.08V (3) PTs 14,400V/120V Incoming 69kV Feeder To 13kV Bus Transformer: 68kV/13.8kV SEL-487E Initiate BKR Failure Timer
25
59 – Zero Sequence Overvoltage BKR 8751N51V 596787N (3) 600/5A (3) 3000/5A (1) 1200/5A (3) CCVTs 72.5kV/67.08V (3) PTs 14,400V/120V Incoming 69kV Feeder To 13kV Bus Transformer: 68kV/13.8kV SEL-487E Initiate BKR Failure Timer
26
Testing Challenges Breaker Failure – Time delay for all elements – Perform testing without disabling elements – Requires some creativity Utilize 2 nd Harmonic Block to disable 87
27
2 nd Harmonic Block
28
Fault Playback Play fault back to the relay Useful for investigations Fully functional test Oscillography/SER
29
Oscillography
30
Future 61850 (GOOSE) Merging Units Optical CTs Sample Values
31
Conclusion Evolution of relay protection Challenges – Training and learning curve – Cybersecurity