Download presentation
Presentation is loading. Please wait.
Published byScott McCoy Modified over 9 years ago
1
Technical questions on oneM2M certification Group Name: TST Source: JaeSeung Song (jssong@sejong.ac.kr), KETI, TST WG Chair Meeting Date: 2015-7-21 Agenda Item: TBD
2
Background oneM2M SC will continue Ad-Hoc on Certification to discuss further technical and political aspects. Political aspects will be investigated further at the SC level Technical aspects need to be consulted by TST WG © 2014 oneM2M Partners 2
3
Political Questions (F.Y.I) Political questions which will be further discussed in the Ad-Hoc are as follows: – Where certification body has to be located (within oneM2M or outside of oneM2M)? – Will there multiple certification bodies for oneM2M certification? – Should the same oneM2M logo be used? Or different logo? (e.g., oneM2M certified) © 2014 oneM2M Partners 3 Certified
4
Technical Questions Technical questions which need to be discussed further within TST WG and provided to the SC Ad- Hoc for their information: – TQ1: Which nodes are the subjects for oneM2M certification? + All Nodes defined in oneM2M? + End Nodes? + End Nodes and Middle Node? © 2014 oneM2M Partners 4 ADNASNMNIN
5
Technical Questions Technical questions which need to be discussed further within TST WG and provided to the SC Ad- Hoc for their information: – TQ2: How self-certification and formal-certification will be applied to these nodes? © 2014 oneM2M Partners 5 ADNASNMNIN
6
Technical Questions Technical questions which need to be discussed further within TST WG and provided to the SC Ad- Hoc for their information: – TQ3: What are the target for oneM2M certification? + Hardware? + Software? © 2014 oneM2M Partners 6 AE CSE AE CSE
7
Technical Questions Technical questions which need to be discussed further within TST WG and provided to the SC Ad- Hoc for their information: – TQ4: Are all the releases subject for full certification? Or only additional features? © 2014 oneM2M Partners 7 Rel-1 Rel-2
8
Technical Questions Technical questions which need to be discussed further within TST WG and provided to the SC Ad- Hoc for their information: – TQ5: What about patched version based on the same release? © 2014 oneM2M Partners 8 Rel-1 Bugs Fixes
9
Proposal Call for your opinion on the technical questions. After some email discussion + one hour discussion in one of conference calls (18.1~18.3), a summary needs to be prepared. Any volunteer to take this action item? © 2014 oneM2M Partners 9
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.