OSG Integration Activity Report Rob Gardner Leigh Grundhoefer OSG Technical Meeting UCSD Dec 16, 2004
2
12/16/2004 OSG Technical Meeting 2 Integration, Validation & Certification Integrate middleware services from technology providers targeted for the OSG Provide testbed for evaluation and testing of new services and applications Test and exercise installation and distribution methods Provide feedback to service providers and VO application developers Allow contributions and testing of new, interoperable technologies with established baseline services Email list – osg-int@opensciencegrid.org and ploneosg-int@opensciencegrid.org
3
12/16/2004 OSG Technical Meeting 3 Activity Model Requirements and schedule are determined with the OSG deployment activity The specific program of work is driven by the deliverables from the satellite activities Effort will be drawn from affiliated OSG projects depending on the service Additional resources needed to support testbed infrastructure Architectural coherence will maintained through participation with the blueprint group Configuration coherence is maintained with the deployment group
4
12/16/2004 OSG Technical Meeting 4 Service Readiness Plan Purpose Service Description Packaging Description Dependencies: resources and services needed Test use cases identified Testing tools – clients, harness Defined metrics for success Effort to contribute to the OSG-IVC and schedule Links to appropriate documentation, WSDL, etc
5
12/16/2004 OSG Technical Meeting 5 Service Path (WIP) OSG Deployment Activity Metrics & Certification Application validation Application Software Installation OSG Integration Activity Release Description Middleware Interoperability Software & packaging Functionality & Scalability Tests Readiness plan adopted Service deployment OSG Operations Activity Release Candidate Readiness plan Effort Resources feedback
6
12/16/2004 OSG Technical Meeting 6 Current Testbed Sites UF (CMS-DGT) UB (CCR-dev) UC (ATLAS DTG) ANL (ATLAS DTG) IU (ATLAS DTG) OU (ATLAS DTG) UTA (ATLAS DTG) ISI JLAB – to join
7
12/16/2004 OSG Technical Meeting 7 Integration Testbed Secure commitments to participate in this activity Site contact information to iGOC Upgrade to VDT 1.2.3 before 1.3.0 Validate existing services VOMS GridCat MonALISA Next meeting: January 6
8
12/16/2004 OSG Technical Meeting 8 Testbed Layout Proposed Stable Production release Development Release dynamic testing resources UF SRM server Eg. OSG Integration Testbed Service platform applications, test harness, clients
9
12/16/2004 OSG Technical Meeting 9 OSG Service Integration Schedule Grid3 core middleware services, upgrade VDT Site security management, GUMS (Gabriele) Storage Existing Grid3 mounted partitions ($DATA, $APP,..) SRM-DRM Service Integration (Jorge, Alex) SRM-dCache (identify service proponent, assist SRP) MIS under discussion at this meeting
10
12/16/2004 OSG Technical Meeting 10 SRM/DRM Integration Readiness First major integration activity Feedback given to initial plan from Jorge; new plan better suited to the OSG Integration testbed and activity model Two sites minimum for integration test – client and server Installation and configuration Interoperable tests with other services Atomic testing: copy, read, move, delete Scalability tests including Queuing Application level tests – CMS and ATLAS to participate
11
12/16/2004 OSG Technical Meeting 11 GUMS Service Readiness Service proponent: G. Carcassi (BNL/PPDG); preliminary readiness plan received 12/13 Testbed and installed instance setup at BNL Account pools - effect on applications & accounting GUMS package and installation instructions Gatekeeper callout to GUMS VOMS servers for each VO – verify Role-based AuthZ: role & access rights assignment testing Feedback/questions on initial plan needed