1 platform for the implementation of NAIADES River Information Services in Europe – results of a survey Andreas Bäck Deputy Project Coordinator of PLATINA

2 2 Introduction  RIS Directive applies to 12+1 countries (RO, BG, HU, SK, PL, CZ, AT, DE, NL, BE, LU, FR and HR (as candidate country))  Objective of activity: Summarize the Status of River Information Services by means of a questionnaire  Questionnaire sent to 13 countries, i.e. 12+1 and Serbia  13 countries responded until 25.2. –Approx. 3.800 km of Class IV –Approx. 10.500 km of Class Va and higher –Approx. 12.000 vessels

3 3 Notices to Skippers (NtS)  Provision of Fairway & Traffic, Water Related and Ice Messages –12/2010: 7 fully operational, 2 pilot, 4 in preparation –12/2012: 10 fully operational, 2 pilot, 1 in preparation  Provision of full text message and code format  Notices to Skippers - international data exchange –12/2010: 1 fully operational, 3 pilot, 8 in preparation –12/2012: 9 fully operational, 3 pilot, 1 in preparation  Usage of 3 different versions of XSD

4 4 Vessel Tracking & Tracing (1/2)  Shore-based infrastructure of Class Va and higher –12/2010: 1.600 km fully operational, 950 km pilot –12/2012: 4.300 km fully operational, 550 km pilot –Total length: 10.500 km  Shore-based infrastructure of Class IV –12/2010: 50 km fully operational, 200 km pilot –12/2012: 500 km fully operational, 200 km pilot –Total length: 3.800 km  Position information - international data exchange –12/2010: 1 fully operational, 6 pilot, 3 in preparation –12/2012: 5 fully operational, 4 pilot, 1 in preparation

5 5 Vessel Tracking & Tracing (2/2)  Services of shore-based infrastructure (over Inland AIS) vary between countries  AIS equipment program –12/2010: 5.500 transponders provided –12/2012: 11.500 transponders provided –Total approx. 12.000 vessels  AIS operation requirements (usage of a Inland AIS transponder - if on board): 4 in force, 4 planned  AIS carriage requirements (carriage and operation of Inland AIS transponder): 1 in force, 5 planned

6 6 Electronic Reporting  Reporting of ERINOT message –12/2010: 2 fully operational, 3 pilot, 6 in preparation –12/2012: 5 fully operational, 6 pilot  BERMAN and PAXLIST Message implemented in the Netherlands and Croatia  ERINOT - international data exchange –12/2010: 3 fully operational, 1 pilot, 7 in preparation –12/2012: 3 fully operational, 8 pilot, 1 in preparation  Reporting requirement: 2 in force, 2 planned

7 7 Electronic Navigational Charts (1/2)  Electronic Navigational Charts of Class Va and higher –12/2010: 7.500 km fully operational, 400 km pilot –12/2012: 8.900 km fully operational, 400 km pilot –Total length: 10.500 km  Electronic Navigational Charts of Class IV  12/2010: 1.000 km fully operational  12/2012: 1.000 km fully operational  Total length: 3.800 km

8 8 Electronic Navigational Charts (2/2)  Actual depth data for critical stretches (e.g. free flowing sections) provided only in 3 countries  ENC available free of charge: 12/2011  10 free availability, 1 in preparation  Usage of 4 different versions of the standard

9 9 Hull Data Processing  National Hull Databases –12/2010: 6 fully operational, 4 in preparation, 1 not planned –12/2012: 8 fully operational, 3 pilot  Exchange of information with European Hull Database –12/2010: 3 pilot, 5 preparation, 3 not planned (partly depending on amendment of 2006/76/EC) –12/2012: 7 fully operational, 2 pilot, 2 not planned (partly depending on amendment of 2006/76/EC)

10 10 RIS Index  Object of highest and high priority are not prepared in a harmonized way  Use of RIS Index for VTT, ERI and NtS not yet in all countries  Exchange with RIS Data Reference Management System –12/2010: 6 in preparation, 2 not planned –12/2012: 5 fully operational, 1 pilot, 2 in preparation

11 11 On board equipment According to information from expert groups, RIS equipment is estimated on board of vessels:  6.000 Inland ECDIS Viewers  Electronic Reporting  98% of the container vessels are reporting electronically  30% of the tanker vessel  5% of the dry cargo.  5.450 Inland AIS transponders (see before)  Total approx. 12.000 vessels

12 12 Thank you for your attention! Andreas Bäck via donau – Österreichische Wasserstraßen-Gesellschaft mbH PLATINA Project Office Brussels andreas.baeck@via-donau.org, www.via-donau.org