Download presentation
Presentation is loading. Please wait.
Published byFrederica Sutton Modified over 9 years ago
2
Rio de Janeiro, Brazil 15 May 98Worldwide CNS/ATM Conference Successful CNS/ATM Project Implementation: Human Resource and Training Needs Dr. Frank T. Ruggiero Project Director FANS Stakeholders’ Group IATA Headquarters, Montreal, Quebec RuggieroF@IATA.Org
3
Rio de Janeiro, Brazil 15 May 98Worldwide CNS/ATM Conference CNS/ATM Success Factors
4
Rio de Janeiro, Brazil 15 May 98Worldwide CNS/ATM Conference ( Satisfying Regional Differences while Maintaining Interoperability with Global Approach ( Cost-benefit & Business Case for adopting FANS, CNS/ATM elements for all stakeholders’ ( Need for “implementation orientated” regional coalitions for achieving real progress ( Team-Centered, Human Resources Management, Planning & Training ( Plan and manage full system life-cycle solution Planning for Success: Lessons from 5 Years of Projects
5
Rio de Janeiro, Brazil 15 May 98Worldwide CNS/ATM Conference Focus on Technical System Component Design
6
Rio de Janeiro, Brazil 15 May 98Worldwide CNS/ATM Conference (RNP 5) Basic RNAV ‘98 / 8.33 kHz VHF ‘99 / (RNP 1) Data Link Comm ‘01 (RNP 10) ‘98/ ADS-A, RNP -4 CPDLC ‘03 (RNP 10) ‘98/ ADS-A, RNP-4 CPDLC ‘03 Reduced Vertical Separation Minimums (RVSM) ‘98 Focus on Technical System Component Design
7
Rio de Janeiro, Brazil 15 May 98Worldwide CNS/ATM Conference Typical CNS/ATM Transition Table Focus on Technical System Component Design
8
Rio de Janeiro, Brazil 15 May 98Worldwide CNS/ATM Conference Airport Analysis Lacks Work Systems
9
Rio de Janeiro, Brazil 15 May 98Worldwide CNS/ATM Conference Work Task/Systems Analysis
10
Rio de Janeiro, Brazil 15 May 98Worldwide CNS/ATM Conference Large System Development
11
Rio de Janeiro, Brazil 15 May 98Worldwide CNS/ATM Conference Full Life-cycle Project Planning Process
12
Rio de Janeiro, Brazil 15 May 98Worldwide CNS/ATM Conference Conclusions
13
Rio de Janeiro, Brazil 15 May 98Worldwide CNS/ATM Conference Develop a new accredited job skill “Bridge” between Planning and Operations Modular training approach Would not replace consultants, but improve their effectiveness and reduce risk CNS/ATM Implementation Specialist CNS/ATM Implementation Specialist CNS/ATM Implementation Specialist
14
Rio de Janeiro, Brazil 15 May 98Worldwide CNS/ATM Conference RuggieroF@IATA.Org
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.