Presentation is loading. Please wait.

Presentation is loading. Please wait.

COMPLETED WORKS _ PREFABRICATED BUILDING + DESIGN SKILLED CRAFTSMANSHIP IN ALL ASPECTS OF CONSTRUCTION. POST AND BEAM CONSTRUCTION IS FAST AND RELATIVELY.

Similar presentations


Presentation on theme: "COMPLETED WORKS _ PREFABRICATED BUILDING + DESIGN SKILLED CRAFTSMANSHIP IN ALL ASPECTS OF CONSTRUCTION. POST AND BEAM CONSTRUCTION IS FAST AND RELATIVELY."— Presentation transcript:

1 COMPLETED WORKS _ PREFABRICATED BUILDING + DESIGN SKILLED CRAFTSMANSHIP IN ALL ASPECTS OF CONSTRUCTION. POST AND BEAM CONSTRUCTION IS FAST AND RELATIVELY EASY.

2 COMFORTABLE CONTEMPORARY DESIGNS. BIO-POOLS, SAUNA, STEAM-ROOM, ENTIRELY OFF-THE-GRID DESIGN, INCLUDING SOLAR PANELS, PHOTOVOLTAIC PANELS, BOILER SYSTEMS, AND VARIOUS ALTERNATIVE ENERGY SOURCES. ENTIRE “KIT” (ALUMINUM, TIMBER PANELS, WINDOWS, DOORS, ETC) CAN BE EASILY ASSEMBLED ON SITE. COMPLETED WORKS _ PREFABRICATED BUILDING + DESIGN

3 PRECEDENT STUDIES _ EARTH TEMPLE

4 www.earthtemple.co.za EARTH TEMPLE ARCHITECTS NATURAL ARCHITECTURE + LANDSCAPE Co. REG: 87/20139/23 VAT: 4480171455 Cape Town Humansdorp P. O. Box 699, Humansdorp, Eastern Cape, South Africa Email: life@earthtemple.co.za Honeyville Farm: +27 (0)42 295 1417 cell: +27 (0)82 415 0265


Download ppt "COMPLETED WORKS _ PREFABRICATED BUILDING + DESIGN SKILLED CRAFTSMANSHIP IN ALL ASPECTS OF CONSTRUCTION. POST AND BEAM CONSTRUCTION IS FAST AND RELATIVELY."

Similar presentations


Ads by Google