SPP.org 1. ESRPP 2009 Regional Studies Initial Results ESRPP Stakeholder Meeting August 12, 2009 Astor Crown Plaza New Orleans, Louisiana.

Similar presentations


Presentation on theme: "SPP.org 1. ESRPP 2009 Regional Studies Initial Results ESRPP Stakeholder Meeting August 12, 2009 Astor Crown Plaza New Orleans, Louisiana."— Presentation transcript:

1 SPP.org 1

2 ESRPP 2009 Regional Studies Initial Results ESRPP Stakeholder Meeting August 12, 2009 Astor Crown Plaza New Orleans, Louisiana

3 SPP.org 3 Selected ESRPP Study Projects Turk-McNeil 345 kV Spadra-Russellville 161 kV Turk-Fulton-El Dorado 345 kV Messick 500/230 kV Autotransformer Flint Creek-Chamber Spr-Fort Smith-ANO 345 kV

4 SPP.org 4 Regional Study Overview Map 3 1 3 5 2 345 kV 161 kV

5 SPP.org 5 General Study Assumptions for Step 1 High-Level Analysis MUST DC analysis of FCITC Monitored and Contingent Elements 115 kV and above elements within: 1.Entergy Zones adjacent to SPP 2.SPP Areas adjacent to Entergy All elements 345 kV and above in SPP and Entergy N-1 Contingency Scan (no breaker-to-breaker scan)

6 SPP.org 6 General Study Assumptions for Step 1 High-Level Analysis, cont. MDWG MOD Model 2014 Summer Peak Incorporate Entergy’s Construction Plan Projects Identical Source/Sink Transfer Analyses will be performed for all study projects FCITC Changes from the Base Case will be identified Planning-level cost estimates and construction timelines provided

7 SPP.org 7 AEPW CLECO SWPA EMDE OGE WOTAB Amite South SPP Areas SPP (all) AEP West CLECO OG&E Empire District SWPA Entergy Areas Entergy (all) Amite South WOTAB 18 Combinations, bi-directionally = 36 Combinations Source/Sink Areas for Transfer Analysis

8 SPP.org 8 Entergy Net Interchange 1471 MW Net Export to all areas 1033 MW Net Export to SPP Positive number indicates EXPORT Negative number indicates IMPORT

9 SPP.org 9 FCITC Results: Baseline

10 SPP.org 10 (#1) Turk – McNeil 345 kV Turk McNeil New 345 kV Line

11 SPP.org 11 FCITC Results: Turk-McNeil 345 kV

12 SPP.org 12 (#2) Spadra – Russellville 161kV Line Little Spadra Russellville East New 161 kV Line

13 SPP.org 13 FCITC Results: Spadra-Russellville 161 kV

14 SPP.org 14 (#3) Turk – Fulton – El Dorado 345 kV Turk El Dorado 345 kV Fulton New 345 kV Line

15 SPP.org 15 FCITC Results: Turk-Fulton-El Dorado 345 kV

16 SPP.org 16 (#3) Messick 500/230kV Autotransformer New 500/230kV Autotransformer at Messick Existing Mt. Olive- Hartburg 500 kV Line

17 SPP.org 17 FCITC Results: Messick 500/230 kV Auto

18 SPP.org 18 (#5) Flint Creek – Chamber Springs – Fort Smith – ANO 345kV Line Flint Creek Chamber Springs Fort Smith ANO New 345 kV Line

19 SPP.org 19 FCITC Results: Flint Creek-Chamber Spr- Ft Smith-ANO 345 kV

20 SPP.org 20 Next Steps Continue Transfer Analysis Next Meeting: Draft Report, Stakeholder Input Post Final Report First Meeting of Next Cycle: Select Step 2 Studies Select Step 1 Studies


Download ppt "SPP.org 1. ESRPP 2009 Regional Studies Initial Results ESRPP Stakeholder Meeting August 12, 2009 Astor Crown Plaza New Orleans, Louisiana."