TO WHOM IT MAY CONCERN We, N.P.E Co. the provider of technical services and man-power to the most power plant and factories in Iran with over 18 year experience are ready to provide different activities such as : Installation, operation and maintenance of all mechanical and electrical Equipments (Gas & Steam Turbine power generators, Diesel power generator, Power distribution panel) Installation, operation and maintenance of HVAC system (Air condition & Air handling units) Piping & cabling Insulation of pipe & Equipment & spray insulation Sincerely Yours N.P.E Co N.P.E Industrial Co No 86. Kheyrandish alley, Dr Heshmat st. Rasht – Iran TEL : +98 13 33344037 & +98 13 33325295 FAX : +98 13 33344037 & +98 13 33333960 MOB : +98 911 131 4803 E-Mail : info@npecompany.net & npecompany@yahoo.cominfo@npecompany.netnpecompany@yahoo.com
15
Blow out piping Precomitioning - GEA PART 1170 MW GCCPP HP piping welding LBA PIPING – SIEMENS PART 1170 MW GCCPP
16
Conversion Project Relocation Work (PHASE-1) Aryan Mahtab Gostar Co.
17
Piping and equipment erection UGD BUILDING - GEA PART Gilan 1170 MW CCPP Change of damage compensator GEA PART Gilan 1170 MW CCPP
18
Change of damage compensator with new type d = 4800mm for all units ACC SYSTEM – GEA PART Gilan 1170 MW CCPP
19
Piping and equipment erection UQC BUILDING – SIEMENS PART Gilan 1170 MW CCPP Tank erection UQC BUILDING (ROOF) SIEMENS PART Gilan 1170 MW CCPP
20
Piping and equipment erection UEL BUILDING – SIEMENS PART Gilan 1170 MW CCPP Piping and equipment erection ULD BUILDING – SIEMENS PART Gilan 1170 MW CCPP
21
Switching area panel erection and cabling UAC – SIEMENS PART Gilan 1170 MW CCPP
22
BAT & BBT transformer installation Gilan 1170 MW CCPP
23
Damage gearboxes repair (maintenance) GEA PART Gilan 1170 MW CCPP
24
Sand blasting & painting ACC structure – GEA PART Gilan 1170 MW CCPP
25
Turbine spray Insulation Neka CCPP Turbine Hall piping Insulation SIEMENS PART Gilan 1170 MW CCPP
26
Main gas pipe line repair SIEMENS PART Gilan 1170 MW CCPP
28
Insulation Work LBA, LBB PIPING - SIEMENS PART Gilan 1170 MW CCPP
29
Touch up and final painting ACC – GEA PART Gilan 1170 MW CCPP
30
Fan ring installation ACC SYSTEM – GEA PART Gilan 1170 MW CCPP Fan ring installation ACC SYSTEM – GEA PART Gilan 1170 MW CCPP
31
Manufacturing LOUSHAN ‘s Power plant cooling tower ( Cell 2 Unit 2 ) & ( Cell 3 Unit 2 )
32
Installation and commissioning of swirl flash system in RASHT combined cycle power plant
33
Erection & Replacement Of 84 PCs Gearboxes of Air Cooled Condenser System (200KW) In Guilan CCPP
41
Seyed Mostafa Madani Director Manager Electrical Engineer B.S. 32 Year Experience Supervisory Of Welding Works District Superintendent Of Electrical & Mechanical Equipments Project Manager Farzin Bagheri Person Of Board Of Directors Mechanic Engineer B.S. 22 Year Experience Technical Office Manager Site Manager Project Manager Project Manager