Presentation is loading. Please wait.

Presentation is loading. Please wait.

ISE 6 Phase 2 Demo Scenario Sept 11, 2008 NSWC CD.

Similar presentations


Presentation on theme: "ISE 6 Phase 2 Demo Scenario Sept 11, 2008 NSWC CD."— Presentation transcript:

1 ISE 6 Phase 2 Demo Scenario Sept 11, 2008 NSWC CD

2 2 Current Issues Confirm data exchange scenario Define level of NSWC PHD / Raytheon participation Discuss details of IPT CAD modeling Start to define demo data –HVAC system –HVAC system PLCS logistics data –HVAC system S1000D modules

3 3 ISE 6 Phase 2 Demo Scenario Dual Band Radar, provided by NSWC PHD, is incorporated into LPD 17 and DDG 1000 design. Export selected Dual Band Radar system from LPD IDE as PLCS data with S1000D data modules PLCS data modified to allow importation into DDG 1000 IDE PLCS data imported into DDG 1000 IDE New Mod of Dual Band Radar is developed and authorized for use New radar cabinets generate more heat, require additional cooling in the space New cooling requirements passed to Shipyard Engineering HVAC system is redesigned Affected S1000D data modules for HVAC system IETM are updated HVAC system IETM updated Updated design passed to LEAPS

4 4 PLCS & S1000D: Functional Scenario Shipyard B Design (3D CAD Data) Shipyard B IDE (Update Tech Pub) Navy IDE (Design & Analysis) Shipyard A IDE (Design, Logistics, Support) Data Prep & QA (Design, Logistics, & CAD) Navy ISEA (GFE Change)

5 5 Teamcenter DDG 1000 IDE Software LEAPS Navy Design & Analysis Repository ShipConstructor 2006 ShipConstructor 2008 Design Navy IDE AIM/SIR LPD 17 IPDE Software Shipyard A IDE Shipyard B IDE episTree Knowledge Management Software 3D Design New Support Requirements AP 239 + S1000D AP 227 HVAC AP 227 HVAC AP 239 + S1000D Common Source DB NAVSEA / Navy ISEA Ship Alt Changes PLCS & S1000D: Exchange Scenario AP 239 Radar data

6 6 Updated Requirements PLCS & S1000D: Data Scenario DM 1.1 DM 1.2 DM 1.3 Chillers Duct 1 Chiller 2 Duct 2 HVAC Sys Drawing2 DM 2.3 DM 2.2 HVAC Sys IETM 1 HVAC Sys IETM 2 ISEA IDE (Radar) DM 1.1 DM 1.2 Mod 1 Radar IETM Mod 1 DM 1.3 Mod 2 DM 2.1 Mod 2 Radar IETM DM 2.2 Chiller 1 HVAC Sys HVAC Ducts HVAC Sys Drawing1 Shipyard Design & IDE

7 7 Demo Data HVAC system PLCS data –Similar to last year’s demo –Equipment – chiller? –AP 227 implications HVAC system Tech Manual / Data Modules –Need to define minimal TM content, divide into DM –Define DMC structure –Define necessary metadata

8 8 Backup

9 9 AIM/SIR LPD 17 IPDE Software Teamcenter DDG 1000 IDE Software episTree Knowledge Management Software LEAPS Navy Design & Analysis Repository CATIA (V4 AEC) ShipConstructor 2006 ShipConstructor 2008 AP 227 AP 239 AP 214 Design Navy IDE Shipyard A-IDE Shipyard B-IDE 3D Design Design & Logistics AP 214 AP 239 Design & Logistics, including 3D Design AP 239 AP239/PLCS (ISE-6 Phase 1) Demo Scenario

10 10 PLCS & S1000D: Functional Scenario Shipyard A Design (3D CAD Data) Shipyard A IDE (Update Tech Pub) Navy IDE (Design & Analysis) Navy Depot (Design, Logistics, Support) Data Prep & QA (Design, Logistics, & CAD) Navy ISEA (GFE Change)


Download ppt "ISE 6 Phase 2 Demo Scenario Sept 11, 2008 NSWC CD."

Similar presentations


Ads by Google