Metals 1 4 th Quarter Project. Considerations Must be completed in 6 weeks Must be affordable for everyone Majority of students will vote on it Cannot.

Similar presentations


Presentation on theme: "Metals 1 4 th Quarter Project. Considerations Must be completed in 6 weeks Must be affordable for everyone Majority of students will vote on it Cannot."— Presentation transcript:

1 Metals 1 4 th Quarter Project

2 Considerations Must be completed in 6 weeks Must be affordable for everyone Majority of students will vote on it Cannot be too large (we are not building go- karts)

3 Directions 1)Research Projects 2)Provide a link for each project 3)Provide a picture for each project 4)Email your powerpoint to: justin.casper@trschools.k12.wi.us justin.casper@trschools.k12.wi.us

4 Resources http://www.trschools.k12.wi.us/faculty/JCASP ER/Welding%20Projects%20Book.pdf http://www.trschools.k12.wi.us/faculty/JCASP ER/Welding%20Projects%20Book.pdf http://www.millerwelds.com/ Google Pintrest

5 Example 1 Hitch & Haul http://www.prolineracks.com/Masterbuilt- hitch-haul-cargo-carrier-30110208.html http://www.prolineracks.com/Masterbuilt- hitch-haul-cargo-carrier-30110208.html

6 Example 2 Welding Projects Book P.49

7 Project 1 (10 Points) Link Picture

8 Picture 2 (10 points) Link Picture

9 Project 3 (10 points) Link Picture