Presentation is loading. Please wait.

Presentation is loading. Please wait.

Lab Reporting Interface – Implementation Guide Analysis- Kick-off Bob Yencha, Erik Pupo April 6, 2011 1.

Similar presentations


Presentation on theme: "Lab Reporting Interface – Implementation Guide Analysis- Kick-off Bob Yencha, Erik Pupo April 6, 2011 1."— Presentation transcript:

1 Lab Reporting Interface – Implementation Guide Analysis- Kick-off Bob Yencha, Erik Pupo April 6, 2011 1

2 Agenda SWG Introductions Purpose Immediate Activities Overview of LRI Implementation Guide Analysis SWG Next Steps 2

3 Purpose Review the variances between two HL7 implementation guides Build consensus around variances and how to resolve/mitigate Select an implementation guide –Can be combination of An existing implementation guide An existing implementation guide with minor modification (may require out of cycle ballot) A blended guide that harmonizes Determine needed enhancement for Meaningful Use Stage 2 and possible enhancements for future Meaningful Use Stage 3 requirements 3

4 Purpose in Action 4

5 Immediate Activities 1.Review the Analysis Matrix prepared by the S&I Framework 2.Review additional matrices in support of implementation guide analysis 3.Highlight variances and possible workarounds 4.Determine requirements in-scope for ambulatory 5

6 Implementation Guide Analysis SWG April 2011May 2011June 2011 Week 1Week 2Week 3 Week 4 Conduct Kick-Off Confirm Volunteers Confirm Lead(s) 1.Review HL7 Implementation Guide Matrix 2.Determine high and low priority variances 3.Map implementation guides to requirements Conduct Preliminary Analysis Build and review on wiki 4.Work through existing list of variances in Analysis Matrix 5.Draft implementation guide recommendation and coordinate with Architecture WG vices and any gaps*Identify named sets of services and any gap In-Person Meeting Review, Comment, & Complete Final Edits on the wiki Build Out SpecificationPrepare Specification for RI team 4. Final implementation guide recommendation Week 1Week 2Week 3 Week 4 Week 1Week 2Week 3 Week 4 6

7 Next Steps 1)Confirm team 2)Establish Leads 3)Post links to implementation guides (HL7 IP) 4)Review HL7 Implementation Guide Analysis Matrix 5)Begin work through the wiki identifying variances –Interested volunteers to document variances? 6)Weekly Virtual Round – for feedback from each of you 7


Download ppt "Lab Reporting Interface – Implementation Guide Analysis- Kick-off Bob Yencha, Erik Pupo April 6, 2011 1."

Similar presentations


Ads by Google