Download presentation
Presentation is loading. Please wait.
Published byEarl Lucas Modified over 9 years ago
1
Your Birchwood Park Golf Centre and Horizones Health and Fitness Club are changing...
2
Opening Spring 2017
3
Birchwood Park Health and Fitness Development
4
New Health and Fitness Club What will change? New wet facilities comprising of 25m pool, and children's pool Adults only spa area incorporating a panoramic sauna, steam room, salt room, hydrotherapy pool, heated beds, ice fountain, feature shower and outside hot tub with loungers Increased fitness arena from 56 to over 80 pieces of equipment, free weights and stretch areas Increased studio timetable from 30 to 50 classes, studio space increases from 2 to 3 studios including new spin studio and bikes Larger combined wet and dry changing facilities Additional member benefits added including: swimming lessons, aqua based classes, active/senior club, junior classes and camps Extended food and beverage area New golf shop and reception area
5
Timescales The development will run for a period of 16 month commencing December 2015, planned opening will be Spring 2017 Phase One – extension for pool, fitness arena, spa area and back of house Phase Two – studios 1, 2 and 3 Phase Three – reception and food and beverage Phase Four – golf shop and reception
6
Eastern Entrance
7
New Entrance
8
Proposed North East Elevation
9
Proposed South East Elevation
10
Proposed South West Elevation
11
Ground Floor Plan
12
Lower Ground Floor Plan
13
Site Plan
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.