Download presentation
Presentation is loading. Please wait.
Published byBrian Horn Modified over 9 years ago
1
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB www.autoflame.com Mk7 Expansion PCB
2
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB www.autoflame.com Features Existing Features Water Level Controls First out Annunciation Bottom Blowdown TDS Control Shunt Switch Philosophy Steam Flow metering New Features Draft Control 2 nd Low Probe Bottom Blowdown Time Reduction Continuous Modulating TDS
3
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB www.autoflame.com Autoflame Draft Control Maintains ideal draft conditions regardless of changing firing rates and stack conditions Entered at each point during the commissioning process Stack pressure is controlled by Pressure sensor Stack Damper PI loop Increase in efficiency of heat transfer Slower combustion velocities
4
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB www.autoflame.com Draft Control Schematic
5
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB www.autoflame.com Draft Control Example – burner not firing Damper closes completely Keeping residual heat in the boiler Preventing induced draft from cooling the boiler
6
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB www.autoflame.com Draft Control Example – purge Damper opens fully To the commissioned “open” position
7
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB www.autoflame.com Draft Control Example – low fire Damper moves to commissioned position 30° Corresponds to a commissioned pressure ?mbar
8
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB www.autoflame.com Draft Control Example – increase in ambient pressure Damper moves to maintain commissioned pressure Maximum change of 20% Between 30 - 36° Maintaining ?mbar
9
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB www.autoflame.com Draft Control Example – decrease in ambient pressure Damper moves to maintain commissioned pressure Maximum change of 20% Between 30 - 24° Maintaining ?mbar
10
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB www.autoflame.com Draft Control Example – cannot maintain ideal draft Damper moves to maintain commissioned pressure, but cannot achieve commissioned pressure Maximum change of 20% 24° Message is flagged on the Mk7 controller
11
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB www.autoflame.com Draft Control Servo
12
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB www.autoflame.com Draft Control Wiring
13
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB www.autoflame.com 7 th Channel Set during commissioning Changes are made to the damper position to set the ideal stack pressure
14
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB www.autoflame.com 2 nd Low Probe Certified low water cut off probe Internal relay self-checking Used with the Expansion PCB or standalone Stainless steel and PTFE construction Cut to length Quick Connect Lead Offsite status logging Different technology to capacitance probes
15
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB www.autoflame.com 2 nd Low Probe
16
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB www.autoflame.com 2 nd Low
17
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB www.autoflame.com 2 nd Low Wiring Power Terminals 4P- 4P+ Comms Terminals 5T+ 5T- RS485 Shared with Bottom Blowdown Comms Simple to install No commissioning required Just enable with Expansion Setup 37.1
18
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB www.autoflame.com Bottom Blowdown Blowdown losses are minimised by reducing the blowdown time This is calculated based on the rate of steam generation as silt and sludge formation is always in ratio to work done (steam generation) assumes 3% of steam generation is lost in bottom blowdown management
19
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB www.autoflame.com Blowdown Valve Fully stainless steel valve construction with PTFE end user replaceable sleeve seating No need for a compressed air supply Electronic proof of open/close end switches Quick servo disconnect facility for manual actuation Rotary operation ensures water tight shutoff Sealing design concept ensures no leaks (no glands)
20
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB www.autoflame.com Blowdown Controller Guaranteed Closure on power failure Up to 4 timed Blowdowns over a 24 hour period 4-20mA valve control and position signals Electronic proof of open/close end switches With a Mk7 M, or stand alone Bottom Blowdown sequence logging Programmable via USB
21
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB www.autoflame.com Bottom Blowdown
22
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB www.autoflame.com Bottom Blowdown Wiring
23
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB www.autoflame.com Continuous Modulating TDS Hardware Complete stainless steel assembly Pressure tested to 1000psi Self cleaning probe End user replaceable PTFE liner Software Timed pulsed TDS operation or Continuous modulating TDS Control and repeatability to 0.1° PI control for TDS target Easy to calibrate TDS reading and target values Polarization detection software Data Logging 24 hour TDS history graphs on the Mk.7 MM 2 year TDS history graphs on the Mk.7 DTI
24
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB www.autoflame.com Continuous Modulating TDS – Above TDS target Target 2500ppm Actual 3000ppm Valve opens fully to reach the TDS target
25
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB www.autoflame.com Continuous Modulating TDS – Reducing TDS level Target 2500ppm Actual 2750ppm As the TDS level drops, the valve modulates using a PI loop
26
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB www.autoflame.com Continuous Modulating TDS – Target valve reached Target 2500ppm Actual 2500ppm As the TDS level drops further, the valve modulates to the closed position as the TDS target is reached
27
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB www.autoflame.com Continuous Modulating TDS – Below TDS target Target 2500ppm Actual < 2500ppm Whenever the TDS level is below the target value, a sample is taken periodically User adjustable time period User adjustable position
28
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB www.autoflame.com TDS Probe Servo
29
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB www.autoflame.com Modulating TDS Wiring
30
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB www.autoflame.com Thank you for listening
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.