Presentation is loading. Please wait.

Presentation is loading. Please wait.

MRAB July 9, 2015. Non Regulatory Agenda plus New TGD Guidance Documents in process Pre-applications Engineering Manual Blaster’s License Suspension Coal.

Similar presentations


Presentation on theme: "MRAB July 9, 2015. Non Regulatory Agenda plus New TGD Guidance Documents in process Pre-applications Engineering Manual Blaster’s License Suspension Coal."— Presentation transcript:

1 MRAB July 9, 2015

2 Non Regulatory Agenda plus New TGD Guidance Documents in process Pre-applications Engineering Manual Blaster’s License Suspension Coal Ash GP Materials Civil Penalties GFCCs Technical Guidance

3 As of June 30, 582 Draft Permits have been sent to EPA EPA has commented or objected on 340 Issues – Checklist – Remining/TMDLs – Sediment Pond Sampling on TMDLs – Detection Limits – June 11 Letter NPDES Permitting Update

4 IssuedCould be Issued Pending Comments3101317 No Comments (99 No Comment Letters) 202319 (Awaiting 30 Days) NPDES Permitting Statistics

5 As of June 30 – 1455 of 1629 have been disposed – 174 (10.7%) remaining for action 100 Renewals 6 Annual Bond Reviews 68 Pottsville/105 California 1 Cambria/0 Greensburg/0 Moshannon/0 Knox Historical Application Progress (Coal)

6 Jan 2007Jan 2011Mar 2014 June 2015 Total Agreements (165) 56107133134 Bonds 31647677 Fully Funded Trusts 143039 Partially Funded Trusts 1110 + 3 ABS 15 + 3 ABS 15 + 3 ABS Trust Agreement/bond Status

7 Jan 2007Jan 2011Mar 2015Jun 2015 Bonds$84.1 M$192.0 M$225.0 M$ 230 M Fully Funded Trusts $38.6 M$52.5 M (69.1 M) $73 M ($77 M) $ 73 M ($ 77.5 M) Partially Funded Trusts $39 M$18.5 M (52.8 M) $60.6 M ($127 M) $60.9 M ($142 M) Financial Summary

8 Count (last report) Average Amount LRFG Operators85 (79) $248,307 ($2.83 M Max) LRFG Permits130 (118) $162,355 ($2.1 M Max) Last QuarterJun 2015 Total Underwritten$19.2 M$ 21.1 M Land Reclamation Financial Guarantees

9 MonthCoal Civil Penalties Interest April$9,335.00$524.08 May$41,388.67$523.53 June$18,641.66$1,180.83 FYTD Total$174,455.00 ($165,732.25) $6,352.13 Rec Fee Account Revenue-2nd Qtr 2015

10 Other Possible Revenue FY 14-15 LRFG Interest$23,970.20 ($51,028.85 from inception) FY 14-15 LRFG Premiums $295,970.20 Reclamation Fee Account

11 Recent Balance (Jun 30) $3,247,670.65 14-15 FY Expenditures$369,197.98 Proj. Expenditures (FY 15-16)$941,785.00 Reclamation Fee Account Status

12 Revenue Interest$6,352.13 CPs (13-14)$298,650.22 Expense Detail FY 14-15 Personnel$16,549.49 Lab$5,279.00 Contracts$153,940.47 Grants$193,429.02 Reclamation Fee Account Activity

13 Regulatory Agenda – Acts 95 and 157-April EQB – Remining (Sub F and Sub G)-May EQB – OSM Program Consistency-Committee – Water Supply Replacement (87 and 88) – Chapter 210/211 – Coal Fees Regulatory Update

14 The three-year report was presented to the EQB Money is deposited into three coal mining funds SMCRA Coal Refuse BMCSLA NPDES Fees go into the Clean Water Fund Coal Fees

15 FY 12-13 $54,417.00 FY 13-14$166,110.00 FY 14-15 (through June) $100,962.43 Coal Fees Revenue

16 FY 12-13 $247,800.00 FY 13-14$523,296.00 FY 14-15 (through June) $474,729.00 CWF Mining Fee Revenue

17 Bureau of Mining Programs 717-787-5103


Download ppt "MRAB July 9, 2015. Non Regulatory Agenda plus New TGD Guidance Documents in process Pre-applications Engineering Manual Blaster’s License Suspension Coal."

Similar presentations


Ads by Google