GGS Cluster 2 and 3 Lobby During Heavy Rains When will these be repaired? Date of shots: July 21, 2012.

Similar presentations


Presentation on theme: "GGS Cluster 2 and 3 Lobby During Heavy Rains When will these be repaired? Date of shots: July 21, 2012."— Presentation transcript:

1 GGS Cluster 2 and 3 Lobby During Heavy Rains When will these be repaired? Date of shots: July 21, 2012

2 For damages like these, the best solution is to FIND THE CAUSE OF THE WATER LEAKS… painting, patching and replacement of baseboards will be useless if the source of the problem is not fixed.

3 Pails put in place to capture water dripping from the ceiling

4 Cluster 2 Lobby wall near lobby exit and dripping lobby ceiling

5 Cluster 3 lobby ceilings and walls

6 Cluster 3 lobby ceiling, dripping with water during heavy rains.

7 Cluster 3 mailbox ceiling. Please note the water marks.

8 Cluster 3 baseboards

9 We don’t need promises. We need SOLUTIONS and we need ACTIONS to happen ASAP. At least give a formal reply to those concerned.


Download ppt "GGS Cluster 2 and 3 Lobby During Heavy Rains When will these be repaired? Date of shots: July 21, 2012."