ASKAP Update David DeBoer ASKAP Project Director 26 May 2010.

Similar presentations


Presentation on theme: "ASKAP Update David DeBoer ASKAP Project Director 26 May 2010."— Presentation transcript:

1 ASKAP Update David DeBoer ASKAP Project Director 26 May 2010

2 High-dynamic range, wide field-of-view imaging Number of dishes36 (3-axis) Dish diameter 12 m Max baseline 6km Resolution30  Sensitivity65 m 2 /K Speed1.3x10 5 m 4 /K 2. deg 2 Observing frequency700 – 1800 MHz Field of View30 deg 2 Processed Bandwidth300 MHz Channels16k Focal Plane Phased Array 188 elements + Infrastructure for Murchison Radio Observatory (MRO) + Support of other projects (MWA, EDGES, +) ASKAP Design Goals

3 ASKAP System and Data Flow NBN

4 Antenna

5 Show Movie

6 Site infrastructure July 2010 | Jan 2011 | July 2011 | Jan 2012 Antennas 2-6 First PAFs - BETA Fibre 7-36 MRO Infrastructure MSF

7

8 Site Layout

9 Site Compound

10 Control Building

11 Phased Array Feed Additional testing on-going on 5x4 prototype at Marsfield. New prototype for Parkes July 2010 Much theoretical work on conducting surveys – good beam! First complete mechanical PAF going together now.

12 Phased Array Feed -4 -2 0 2 4 -4 -2 0 2 4

13 Digital

14 VLBI

15 ASKAP & NZ VLBI of 1934-638 Normal LBA at 1.4 GHzLBA with NZ and ASKAP

16 Cen A

17 CSIRO SST3 continuum image SKADS sky model 6km configuration +/- 4 hours 128 2.53 MHz channels 20s integration 32 PAF beams separated by 0.5deg 14.1 uJy/beam noise AProjectWStack No wplanes in simulation or imaging 10” resolution Made possible by pre-production system loaned by Intel Image equalised May 25, 2010

18 CSIRO SST3 continuum image (zoomed)

19 CSIRO SST3 continuum image