1 Status of the CANGAROO-III Project Masaki Mori ICRR, University of Tokyo International Symposium on High Energy Gamma-Ray Astronomy, June 26-30, Heidelberg Poster GA:10
2
2 CANGAROO collaboration Collaboration of Australia and Nippon for a Gamma Ray Observatory in the Outback Institute for Cosmic Ray Research, U. Tokyo University of Adelaide Australian National University Ibaraki University Ibaraki Prefectural University of Health Science Institute of Space and Astronautical Science Institute of Physical and Chemical Research (RIKEN) Kanagawa University Konan University Kyoto University National Astronomical Observatory of Japan Osaka City University STE Laboratory, Nagoya University Tokai University Tokyo Institute of Technology Yamagata University Yamanashi Gakuin University
3
3 CANGAROO-II 7m telescope In operation since May 1999 Observation 1999/2000 PSR1706-4429h RXJ1713.7-394623h PKS2005-48923h PKS2155-30458h PKS0548-32219h Crab63h Vela10h Data analysis underway - results will be coming soon!
4
4 CANGAROO-III Array of four 10m telescopes in Woomera, South Australia to be operated by 2004
5
5 The first 10m telescope -1 (As of May 2000)
6
6 The first 10m telescope -2 Upgraded from 7m in March 2000 7m telescope (1999)10m telescope (2000) Focal length8m 80cm CFRP mirrors60 (30m 2 )114 (57m 2 ) Number of PMTs512 (1/2 ” )552 (1/2 ” ) Readout electronicsTDCTDC & ADC Point image size 0.15 (FWHM)0.20 (FWHM)
7
7 10m reflector
8
8 Point image size (A. Kawachi, M. Ohishi and J. Kushida)
9
9 552ch imaging camera 3 FOV R4124UV (Hamamatsu) 0.115 pixel Lightguide
10
10 32 channel VME ADC VME-9U, A24/A32, D16 Features: ・ 12 bit ・ 4ch/pC ・ Min. 50ns gate ・ 150ns internal delay
11
11 Observations in 2000 March: Vela pulsar / PSR1259-63 April: SN1006 May: SN1006 June: PSR1706-44 …analysis using, and development of, unified software package in progress
12
12 Schedule FY2000: production of the 2 nd telescope FY2001: installation of the 2 nd telescope / start of stereo observation / production of the 3 rd telescope FY2002: installation of the 3 rd telescope / production of the 4 th telescope FY2003: installation of the 4 th telescope / start of observation by the full array
13
13 Work in progress Refinement of mirror optical quality Wider FOV camera with individually HV- controlled PMTs Front-end electronics in VME-9U Faster data readout Pattern trigger circuit using PLD Flexible, centralized telescope control Total monitor system (calibration light source, environment etc.)
14
14 Camera design 4.2 FOV 427 pixels 3/4 ” PMT (Hamamatsu R3478UV, TTS 0.36ns) (C. Ito)
15
15 Electronics VME-based ・ Discriminator /scaler ・ TDC ・ ADC ・ Trigger ・ CPU (Solaris or VxWorks)
16
16 Telescope separation study 80~120m is not a bad choice ☆ Figure of merit = E -2.5 (effective area)/ (angular resolution) (R. Enomoto)
17
17 Possible layout of the array 31°06 ’ S 136°47 ’ E 160m a.s.l. (J. Patterson)
18
18 Sensitivity in stereo mode (Simulation assuming [optimistic] & rejection power of 100, and timing rejection power of 2)
19
19 And in 2004 … (S. Hara) CANGAROO Website http://icrhp9.icrr.u-tokyo.ac.jp