Presentation is loading. Please wait.

Presentation is loading. Please wait.

Federal Energy Regulatory Commission FERC Information Assessment Team (FIAT) Implementation.

Similar presentations


Presentation on theme: "Federal Energy Regulatory Commission FERC Information Assessment Team (FIAT) Implementation."— Presentation transcript:

1 Federal Energy Regulatory Commission FERC Information Assessment Team (FIAT) Implementation

2 Introduction On March 2, 2005, FIAT presented its Final Recommendation Report to the Commission Before the Commission today are eight draft orders resulting from that report

3 Introduction The orders include : Changes to existing information collections, and Inquiries concerning new information collection needs

4 Changes to Existing Collections E-45RM05-13-000 NOPR FERC 520/566/561 Electronic Filing of Interlocking Positions and Twenty Largest Purchaser Information

5 Changes to Existing Collections E-46RM05-15-000 Final Rule Order No. 580 Modification of Nuclear Plant Decommissioning Trust Fund Guidelines

6 Changes to Existing Collections E-47RM05-11-000Final Rule FERC 523 Electronic Filing of the Application for Authorization for the Issuance of Securities or the Assumption of Liabilities

7 Changes to Existing Collections G-12RM05-12-000NOPR FERC 576/ 588 Modification of Natural Gas Reporting Regulations

8 Changes to Existing Collections G-13RM05-14-000Final Rule FERC 73 Revision of Oil Pipeline Data Filing Instructions

9 Changes to Existing Collections H-3RM05-18-000Final Rule FERC 512 Modification of Hydropower Procedural Regulations

10 New Collections E-2 RM05-16-000 NOI – Confidential Generator Run Status Information Includes information on the commitment, operating performance and capability of generating units.

11 New Collections E-2 RM05-16-000 NOI - Confidential Generator Run Status Information Information allows the Commission to better oversee the markets.

12 New Collections E-3 RM05-17-000 NOI - Requirements for ATC Seeking comment on standardizing Available Transfer Capability (ATC) calculations. NERC Task Force Report provides useful guidance. Standardizing and coordinating ATC would improve market transparency.


Download ppt "Federal Energy Regulatory Commission FERC Information Assessment Team (FIAT) Implementation."

Similar presentations


Ads by Google