Download presentation
Presentation is loading. Please wait.
Published byLoreen Phillips Modified over 9 years ago
1
SENSORY BOARD FOR ADAMS ADVENTURE PLAYGROUND Danielle Napoli Alyssa Smith Christine Wakefield NAPOLI, SMITH, WAKEFIELD 1 Team 22 Project 41 TA – Sarah Brittain Faculty Advisor – Dr. John Enderle Client – Brian Schwarz
2
OVERVIEW The final design will be a 12 ft long, 4 ft tall and 5 in think board positioned at angles. The panels on the ends of the board will be slightly shorter so that children in wheelchairs will be able to roll underneath them and have an opportunity to enjoy all of the activities. NAPOLI, SMITH, WAKEFIELD 2
3
OVERVIEW Panel 1-A: Music Panel Panel 1-B: Memory Game Panel 2-A: Sonar Panel Panel 2-B: Wheel Game Panel 3-A: Create-A-Picture Panel 3-B: Communication Panel NAPOLI, SMITH, WAKEFIELD 3
4
COMPLETED WORK Got in HDPE Ordered rivets and memory game buttons Ordered LEDs and music buttons Bought plexiglass, pvc pipes and scales for wheel game and music panel Had meeting with Adams Adventure board Built Music Panel circuitry and tested CAP buttons
5
SUCCESSES Finally got in the HDPE Got $50 off for the push buttons Found a more cost effective option to mount the braille boards to the HDPE Found an option to cover the memory game buttons Music Panel is working, just need to test it with speakers
6
DRAWBACKS Budget is getting very tight Create-A-Picture is difficult to make circuitry for Limited time to put everything together Posts might come in last minute Had to buy a couple more Braille sheets Music panel pushbuttons are backordered
7
FUTURE WORK See timeline on website
8
FUTURE WORK - DELEGATIONS NAPOLI, SMITH, WAKEFIELD 8 Danielle Napoli Memory Game General bolts and brackets research Take on any extra work with other panels Alyssa Smith Music and C-A-P Panels Call about HDPE & push button donations Christine Wakefield Wheel Panel Sonar Panel All Figure out how to test product in April Create CAP circuitry and test it Begin machining HDPE
9
BUDGET We began with a total of $3,000 $1,000 from Biomedical Engineering Department $2,000 from School of Engineering BME Budget Remaining: $530.52 SoE Budget Remaining: $401.90 Total Budget Remaining: $932.42 NAPOLI, SMITH, WAKEFIELD 9
10
HOURS WORKED Danielle Napoli – 12.5 hrs Alyssa Smith – 20 hrs Christine Wakefield – 12.5 hrs NAPOLI, SMITH, WAKEFIELD 10
11
QUESTIONS NAPOLI, SMITH, WAKEFIELD 11
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.