Download presentation
Presentation is loading. Please wait.
Published byLogan Black Modified over 9 years ago
2
Main goal Operation of a windmill Situation analysis Process of the project Conclusion
3
To ensure the self-sufficiency in electrical energy of the technology room. Available equipment : a 200 Watts windmill
6
Discovery of secondary targets: o Discovery of secondary targets: to tackle the study of a windmill operation to measure the capacitance of our windmill to think about the final results o To think about the constraints we will meet during the project: to think about the safety in the classroom to get a low energy production o To find solutions: to dismantle the blades for the safety to find an adaptable solution to meet the expected results
7
o To research (windmill operation) o Manipulations (measures, calculations,…) o To look for a system : a crank (for the safety) o New manipulations o Results and solutions
8
The final results are too low (we got around 200W and the total need for the classroom is about 8755W), so we had to find a solution :the total need We decided to take into account only lightings and to use a lighting which consumes less (LED floodlight).LED floodlight Besides, thanks to many windows in the classroom, we don’t have to use any ligthings and we can find a complement with solar panels according to the needs. The lighting can become independent
9
Total need in the ISI classroom Previous
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.